Search

You searched for: Start Over Irrigation Remove constraint Irrigation Author Kline, D.J. Remove constraint Author: Kline, D.J. Subject Klamath Straits Drain (Oregon) Remove constraint Subject: Klamath Straits Drain (Oregon) Subject Pumping Plant EE (Oregon) Remove constraint Subject: Pumping Plant EE (Oregon)

Search Results

  • 4375
    P12-201-4294 NA Klamath Project OR-CA. Pumping Plant EE piling for Bent No. 1 background, and Bent No. 2 in place. Required extra piling foreground, left, as piling next to it didn't meet specs. design. ...
    Citation
  • 4376
    P-12-201-4295 NA Klamath Project, OR-CA. Excavation of Pumping Plant EE site, using dragline. A 3500 Manitowoc crane with 1-yard bucket, was in use. Material encountered was same as indicated in Drawing ...
    Citation
  • 4384
    P-12-201-4303 NA Klamath Project, OR-CA. Soldier piling (1'x1') driven to contractor's plan to a depth of ±9', to be used in conjunction with wood lagging to protect worker and work inside Plant EE work ...
    Citation
  • 4579
    P12-201-4497 NA Klamath Project, OR-CA. 3500 Manitowoc leaving PP EE. This crossing is located on east bank of drain enlargement just north of PP EE outlet transition. This area was of concern due to ...
    Citation
  • 4591
    P12-201-4509 NA Klamath Project, OR-CA. Pumping Plant EE -- View of inlet areas of Plants E and EE. Note Plant EE was allowed to flood after removing of dewatering apparatus due to lull in construction ...
    Citation
  • 4611
    P12-201-4529 NA Klamath Project, OR-CA. Photo shows the dike area between the drain and inlet to Plant EE (Approx. 10 ft. wide). Contractor was cautioned about the possibility of this breaking with high ...
    Citation
  • 4612
    P12-201-4530 NA Klamath Project, OR-CA. Same view as Photo P-12-201-4529, except looking east; February 1978; USBR photo by D.J. Kline
    Citation
  • 4616
    P12-201-4534 NA Klamath Project, OR-CA. Pumping Plant EE -- Plant E bridge piling at a depth of 39 feet after nearly 2 days' work. Note water jet at this time consisted of 3/4" steel pipe with Gorman Rupp ...
    Citation
  • 4652
    P12-201-4570NA Klamath Project, OR-CA. Pumping Plant EE. Bucyrus Erie 22-B dragline excavating drain inlet to Plant EE. Note inlet was flooded prior to connecting drain to pumping plant; April 11, ...
    Citation
  • 4653
    P12-201-4571NA Klamath Project, OR-CA. Plant EE. Muck from inlet excavation was double and triple hauled from inlet to just south of flume bridge, then over flume to spoils pile south of flume. It was ...
    Citation