Search
You searched for:
Start Over
History
Remove constraint History
Author
Kline, D.J.
Remove constraint Author: Kline, D.J.
Subject
Irrigation canals and flumes -- Design and construction
Remove constraint Subject: Irrigation canals and flumes -- Design and construction
« Previous | 1 - 10 of 82 | Next »
Search Results
-
P12-201-4489 NA Klamath Project, OR-CA. Second piece of RCP a 16' tangent is lowered into pipe trench by both 3500 Manitowo and 35 ton Manitowol. Two (2) cranes were required because the 3500 had only ...
Citation -
P12-201-4490 NA Klamath Project, OR-CA. Lowering of 1st section of RCP into trench; December 2, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4491 NA Klamath Project, OR-CA. First sections of 24" RCP arrived today. Here a 15° mitre joint is being lifted off lowboy by 3500 Manitowoc; Dec. 2, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4492 NA Klamath Project, OR-CA. Template being used over screeding in placing bedding material for 84" RCP; December 2, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4493 NA Klamath Project, OR-CA. Putting in screeding and 84" RCP in preparation for pipe laying operation; Dec. 2, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4494 NA Klamath Project, OR-CA. Preparation of 84" RCP pipe bedding. Total depth 2' consisting of 1 to 1.5 foot of 3" minus rock and 1' to 6" of 3/4 minus material with a large percentage of fines. ...
Citation -
P12-201-4500 NA Klamath Project, OR-CA. Ady Canal -- Siphon forming going up for round to square transition on outlet of 84" CMP. Bulkhead in background is for shoring tunnel exit from under SP RR tracks; ...
Citation -
P12-201-4512 NA Klamath Project, OR-CA. Ady Canal -- View of siphon round to square transition at the outlet west of the SP RR embankment. Photo shows cribbing and reinforcement prior to removal before ...
Citation -
P12-201-4513 NA Klamath Project, OR-CA. Ady Canal -- View of west bank of SP RR after outler (sic) layer of cribbing and reinforcement were removed. It was deemed unsafe to remove anymore of this cribbing. ...
Citation -
P12-201-4514 NA Klamath Project, OR-CA. Ady Canal -- Note tunnel liner plate extending past tunnel under railroad. Note cemented joint between CMP and round to square transition of siphon. Also note 2 ...
Citation