Search
You searched for:
Start Over
Land use history
Remove constraint Land use history
Author
Hopkins, R.S.
Remove constraint Author: Hopkins, R.S.
Database
Klamath Waters Library
Remove constraint Database: Klamath Waters Library
« Previous | 1 - 10 of 11 | Next »
Search Results
-
1. [Image] Reclaiming Tule Lake land
KP-1113-R2; Looking out across NW1/4. Section 2, T.46 N., R.4 E. Area near pumps used in draining the land; April 17, 1945; Photo by R. S. HopkinsCitation -
KP-1112-R2; Tules have been burnt off. Looking southeast from north dike N-Canal, center of Section 11; April 17, 1945; Photo by R. S. Hopkins
Citation -
3. [Image] Tule Lake bottom lands being reclaimed
KP-1115-R2 - Klamath Project; The water is being drained off and the mud flats come into view. Section 35, T.47 N., R.4 E; April 17, 1945; Photo by R. S. HopkinsCitation -
4. [Image] Tule Lake land in the rough
KP-1110-R2 - Klamath Project; Tulana Farms, the lessee of this land, has constructed a dike holding back Tule Lake waters and have burnt off the tules in preparation for cultivation. Looking south from ...Citation -
KP-1111-R2 - Klamath Project; Tules have been burnt off preparatory to cultivation. Looking south from north dike N-Canal, north center of Section 11; April 17, 1945; Photo by R. S. Hopkins
Citation -
KP-1109-R2 - Klamath Project; Used in putting the final touches on leveling of land. The landplane has a 60' wheelbase. Operations on the August Turner farm south of Tulelake; April 17, 1945; Photo by ...
Citation -
KP-1165-R2 Klamath Project. Power companies (sic) transformer pole toppled over, dropping the transformers into the mud. Dewatering pumps were drowned out. Plant pumps and meters set in place but not ...
Citation -
KP-1167-R2 Klamath Project - Klamath Straits Drain Outlet; Flood irrigation of the lands is in progress. View shows effects of a wind storm on power line due the the poor stability of earth in which ...
Citation -
9. [Image] View of the Fish and Wildlife Service outlet from Lower Klamath Lake into the Klamath Straits Drain
KP-1175-R2 Klamath Project; The outlet is to be used temporarily until such time a new structure is constructed. Note: Erosion of the dike on the left showing anticipated effect of use of the outlet ...Citation -
10. [Image] N-12-a Lateral and 101-A-1 Drain
KP-1098-R2 - Klamath Project - Tule Lake Division - Modoc Unit; Excavation on the construction of the lateral is proceeding by use of an Osgood dragline. The west bank seen in the left of the picture ...Citation