Search

You searched for: Start Over Irrigation Remove constraint Irrigation Author Greene, K.J. Remove constraint Author: Greene, K.J. Subject Tule Lake Region (California) Remove constraint Subject: Tule Lake Region (California) Database Klamath Waters Library Remove constraint Database: Klamath Waters Library

Search Results

  • 3722
    KP-2628-R2-Klamath Project -- TULE LAKE SUMP 2, Specifications DC-5307. Potato field, Lease unit No. 39, irrigated from irrigation system constructed in 1960; July 14, 1961; Photo by K.J. Greene
    Citation
  • 3295
    KP-2408-R2 - TULELAKE IRRIGATION DISTRICT - Klamath Project. Small pumping plant which pumps water from No. 45 drain into J-11 lateral. This type is called a "box pump" locally. The vertical column is ...
    Citation
  • 3714
    KP-2620-R2-Klamath Project -- TULE LAKE SUMP 3, N-1 LATERAL. View looking north showing completed lateral, 101-C-1 Drain and east-west secondary drains. North-south lines in fields are farmers' irrigation ...
    Citation
  • 3715
    KP-2621-R2-Klamath Project -- TULE LAKE SUMP 3, N-8 LATERAL. View looking north showing reconstruction of lateral under Specs. DC-5389. East bank of existing lateral is being moved to form west bank of ...
    Citation
  • 3747
    P12-200-2649 - Klamath Project, California - TULE LAKE SUMP 3, N-13 Lateral Specifications DC-5686. View looking west from N-Canal bank. Bottom lining, south lining and bank are completed. Lining on north ...
    Citation
  • 3220
    KP-2346-R2 - Klamath Project--TULE LAKE DIVISION; May 1956; Photo by K. J. Greene
    Citation
  • 3732
    KP-2634-R2-Klamath Project -- TULE LAKE SUMP 2. Harvesting potatoes in Lease Unit 31 in area under irrigation and drainage system constructed in 1960 under Specifications DC-5307. Yield about 300 sacks ...
    Citation
  • 3751
    P12-200-2653 - Klamath Project, California - TULE LAKE SUMP 3, N-12-e Lateral, Specifications DC-5686. View looking east to 42-inch diameter flume over 101-B Drain. Large amount of return flow from secondary ...
    Citation
  • 3406
    P12-200-2701 - Klamath Project, California - TULE LAKE SUMP 3 - Specifications DC-5686 - N-12-a Lateral, Station 78. View looking southeast showing motor patrol finishing lining; September 5, 1962; Photo ...
    Citation
  • 3524
    KP-2511-R2-Klamath Project -- Tule Lake Sump 2, Pumping Plant 9. Tule Lake Irrigation District removes old structure at pumping plant site. This structure was floated on oil barrels and end was anchored ...
    Citation