Search

You searched for: Start Over History Remove constraint History Author Bergloff, Andrew M. Remove constraint Author: Bergloff, Andrew M.

Search Results

  • 2440
    KP-13 - Aerial Photograph of the Proposed Lower Lost River Channel Improvement. Looking almost straight north onto the northerly end of that portion of the big island in the channel of Lost River which ...
    Citation
  • 2441
    KP-14 - Aerial Photograph of the Proposed Lower Lost River Channel Improvement. Looking straight north on the east-west road crossing over Lost River Channel. The island in the river is farmed through ...
    Citation
  • 2442
    KP-15 - Aerial Photograph of the Proposed Lower Lost River Channel Improvement. The white line entering the picture at lower right is the west end of the North Main Dike and where it extends vertically ...
    Citation
  • 2446
    KP-1929 - Klamath Project. Lower Cost Canal Lining. Wasteway of the N-16 Lateral showing method of laying asphalt. Pipe through center of roll is used to carry roll up side of bank; March 29, 1950; Photo ...
    Citation
  • 2463
    KP-1944 - Klamath Project. Lost River Channel Improvement, Langell Valley. Bridge at cheese factory just before the replacement of piling. C. O. Wamstad and Hugh P. Crawford, inspecting. Government ...
    Citation
  • 2464
    KP-1945 - Klamath Project. Lost River Channel Improvement, Langell Valley. Picture of bridge at Sta. 454-01 on Lost River just before replacement of piling. Picture taken from northwest side of Bridge. ...
    Citation
  • 2465
    KP-1946 - Klamath Project. Lost River Channel Improvement, Langell Valley. Structure 14, Specs. 2578, 36" x 30' corrugated metal pipe. Picture shows headwall and rock paving; May 15, 1950; Photo by ...
    Citation
  • 2466
    KP-1947 - Klamath Project. Lost River Channel Improvement, Langell Valley. Picture of bridge, located at Sta. 454-01 on Lost River. Picture taken just previous to the replacement of piling. Test drive ...
    Citation
  • 2470
    KP-1951 - Klamath Project. Lower Lost River Channel Improvement. Picture shows condition of North Main Dike, also farm land which runs to edge of 40-B Drain; June 5, 1950; Photo by Andrew M. Bergloff...
    Citation
  • 2558
    KP-1968-Klamath Project. Lower Lost River Diversion Dam. Picture taken 75 feet from protective wall just below dam apron looking north. Andrew M. Bergloff, Photo. June 8, 1950.
    Citation