Search

Search Results

  • The focus of this present study is to perform the following tasks: * Develop a hydrodynamic and water quality model of the reservoir formed by the Amaila Falls Hydroelectric Project * Develop and run modeling ...
    Citation
  • The purpose of this study was to improve the existing Version 3.0 application of CE-QUAL-W2 of the Pend Oreille River between Box Canyon Dam and Albeni Falls Dam by performing the tasks outlined above. ...
    Citation
  • The objectives of this project were to: • Develop a hydrodynamic and temperature model of Pend Oreille River using CE-QUAL-W2 Version 3.2 • Calibrate the CE-QUAL-W2 model to field data collected during ...
    Citation
  • The Upper Spokane River system under consideration is located in the Northeastern part of Washington State and runs from the Stateline with Idaho, River mile (RM) 96.0, downstream to Long Lake dam at RM ...
    Citation
  • The State of Oregon Department of Environmental Quality (DEQ) is developing a TMDL for temperature in the Willamette River basin shown in Figure 1. The study area included the Willamette River and all ...
    Citation
  • The State of Oregon Department of Environmental Quality (DEQ) is developing a TMDL for temperature in the Willamette River basin shown in Figure 1. The study area included the Willamette River and all ...
    Citation
  • Laurance Lake is a reservoir located in Hood River County, Oregon (Figure 1). It is located at the base on Mt. Hood in Oregon (see Figure 2 and Figure 3), discharges into the Middle Fork of the Hood River. ...
    Citation
  • This report describes the data processing and model calibration performed for a hydrodynamic and water quality model of the Green River, located in King County, Washington. Figure 1 shows the location ...
    Citation
  • A water quality model of Lake Whatcom, Washington was developed as part of a Total Maximum Daily Load Study for the Washington Department of Ecology. Lake Whatcom is a large natural lake which is listed ...
    Citation
  • The Washington Department of Ecology is interested in developing a temperature Total Maximum Daily Load (TMDL) allocation for the Pend Oreille River between the Albeni Falls Dam (U.S. Army Corps of Engineer’s ...
    Citation