Search
Search Results
-
CONTENTS PAGE I. THE SALMON AND THE FISHERY OF KLAMATH RIVER 2695 Introduction 2697 General Characteristics of Klamath River Salmon 2699 Species Other Than King Salmon 26916 The Spring Migration (Immigration) ...
Citation Citation
- Title:
- Salmon of the Klamath river, California : 1. The salmon and the fishery of Klamath river. 2. A report on the 1930 catch of king salmon in Klamath river
- Author:
- Snyder, John Otterbein
- Year:
- 1931, 2005
CONTENTS PAGE I. THE SALMON AND THE FISHERY OF KLAMATH RIVER 2695 Introduction 2697 General Characteristics of Klamath River Salmon 2699 Species Other Than King Salmon 26916 The Spring Migration (Immigration) 26918 The Summer Migration (Immigration) 26923 Sex Representation in the Migration 26933 Fish Increase in Average Weight and Size as the Season Advances 26939 Angling for Salmon 26943 Seaward Migration (Emigration) 26944 Obstructions in the River 26950 The Age at Maturity of Klamath King Salmon 26952 Marking Experiments 26967 Experiment in 1916 26968 Experiment in 1918 26968 Experiment in 1919 26968 Experiment in 1920 26968 Experiment in 1922 (Sacramento River) 26971 Experiment in 1922 (Klamath River) 26972 Experiment in 1923-1924 269 143 Ocean Tagging 26980 Depletion 26981 Notes Relating to the Salmon Catch of Klamath River 26988 The Ocean Catch 26992 Age Characteristics of the Ocean Catch 269108 Artificial Propagation in Klamath River 269111 Summary 18 269119 II. A REPORT ON THE 1930 CATCH OF KING SALMON IN KLAMATH RIVER 1823
-
DOCS I 49.107: 89 ( 1.1) 89( 1.1) EVALUATION OF SITE SPECIFIC RESTORATION PROJECTS FOR THE ENTIRE KLAMATH RIVER BASIN. 1989 Klamath Field Review Comments The following comments are based primarily upon ...
Citation Citation
- Title:
- Evaluation of site specific restoration projects for the entire Klamath River basin
- Year:
- 1989, 2005
DOCS I 49.107: 89 ( 1.1) 89( 1.1) EVALUATION OF SITE SPECIFIC RESTORATION PROJECTS FOR THE ENTIRE KLAMATH RIVER BASIN. 1989 Klamath Field Review Comments The following comments are based primarily upon field observations made by Scott Downie and Andy Kier during the summer and autumn of 1989, Some of the review was made accompanied by personnel responsible for the projects and their comments are incorporated as well. In many streams individual project sites are linked and/ or similar in nature. This review generalizes these in its comments and ratings, but notes exceptions where required. Grades A- F were assigned, but like all grades lacking set criteria and good base- line information, they are somewhat subjective. Evaluations were based upon the observed or perceived physical response mf. de by the stream to the project, whether or not the project satisfied the objectives of the proposal, and whether or not the project appeared to have durable structure and function without maintenance or modification. Biological evaluation was impossible except to note observed fish at the time of the review. Cost effectiveness is again somewhat subjective without more front- end information, but based upon personal experience an attempt to measure product for cost entered into grade assignment. GENERAL: 1000, 1001, 1003: The racks on Bogus Crk, Scott R. & Shasta R were all operational Summer 1989. 1002: The Salmon R. weir operations were modified during our review period in response to public input: 1. The trap and weir will be staffed 24 hrs/ day. 2. Weir and trap operations will cease at 73 F. 3. Fishing will not be allowed below weir. 4. An alternate site will be developed ASAP. LOWER KLAMATH SUBBASIN: Ah Pah Creek ( 11006, 07, 08, 09, 10, 18-$ 123,928): A CCC, DFG, & Simpson Timber Co. project to provide improved access for adults into upper Ah Pah Crk., and to control sedimentation from failing banks in the treatment area. In Oct. 1989, the Hewitt Ramp structures were successfully passing coho and steelhead adults and juveni'es through a previous adult barrier section. Large wood and boulder cover elements had been placed in the associated pools. Treated banks were armored with rock filled gabions and planted with alder, willow and conifers. No evidence of sediment production to the stream from these treated slopes was observed. The workmanship and construction are sturdyand of high quality. Grade A. { Since we visited Ah Pah Crk. the day after the RNP bypass failure, the stream was loaded with suspended sediments) 1990 - Review Comments- Bluff Creek ( 11022, 23, 24, 31, 32-$ 212,000): Access provided through lower Bluff Crk's former barrier section is still passing adults and juveniles following the Feb. 1986 flood event. The boulder weirs and boulder clusters near the yearling rearing facility are providing limited spawning improvement, but they do contain pockets of gravel utilized by spawners. Both the weirs and clusters have provided some good quality summer rearing habitats, and also refuge areas during winter flows. Two cluster groups are now buried under large streambank failures. These events could have been exacerbated by the placement of the boulders too close to the now failed right bank. No large wood or brush cover elements were utilized in the structures, although some were available. Personnel explained that the extreme velocities and power at high discharges prevented incorporating these organic components into their instream structures on Bluff Crk, Grade C. Camp Creek ( 11029, 30-$ 125,000): Six boulder weirs were constructed by USFS to trap spawning gravels. Two of the six weirs are now scattered boulder clusters, having been rearranged by the stream. The surviving weirs have provided gravels and are being used by fish. The boulder groups, both designed and incidental, are providing some good quality rearing habitats and some pockets of gravel used for spawning salmonids. 3rade C. Cappell Creek ( 11027-$ 125,000): BIA artificial propagation project. Project has operated for one year. It has released 17,035 CWT Chinook. Typical of the lower river hatchery programs, securing desired numbers of late running chinook broodstocks is very difficult. A lot of money in terms of fry produced, but the facility start- up costs are now over and the annual cost will be much less than the initial investment. Grade C. Hunter Creek ( 11001, 11002, 11013-$ 19,328): A CCC, DFG, and Simpson project to improve Hunter Creek on a basin scale. CCC now have a thorough instream assessment and instream structure plan prepared by Clearwater Biostudies, inc. under contract to them. Instream structure work is now underway by CCC crews. The construction is of excellent quality and design. All upper stream barrier work is now completed. The dry lower reaches of the stream pose a dewatered, complete barrier to all adults running before early November in most years ( T. Payne, 1989). Some concern over future land management's effect on the stream in the event of a major flood occurrence. Grade B. McGarvey Creek ( 11025, 11014, 11003-$ 24,264): Status of the hatch box project is not known. The barrier work is all done and passing fish. Grade C. - Review Comments- Pecwan Creek ( 11021, 11036, 11028-$ 50,000): A total of 21,626 yearling chinook were released from 1982- 84 from this facility* They were from Iron Gate stocks and deemed not suitable for the restocking goals of the project area. Since 1985, the facility's production is not well documented, but 27,000 for the period 1985- 88 is estimated. None of the releases from this site have been CWT. The Pecwan site has been used as a broodstock source for Cappell Creek as well. Grade D. Red Cap Creek ( 11033, 34, 35-$ 70,000): USFS project has produced some impressive results. Failing banks have been armored and vegetated. A series of over thirty boulder weirs and clusters have provided some high quality spawning and rearing habitats. Large wood cover elements have been used somewhat in the project. The project reach is in a stream section of former generally poor habitats and low utilization by salmonids; they were abundant during our visits. There is a yearling pond adjacent to the treatment section. Grade A. Richardson Creek ( 11026-$ 25,200): This project removed a barrier to salmonids and is functional. Seemed expensive. Grade C. Salt Creek ( 11000, 11012-$ 18,944): CCC successfully stabilized failing banks. All barrier work is completed and functional. One of the few upslope erosion control projects in the review has controlled the sediment output from the roadway. There is a lot of product here for the money. Grade A. Surpur Creek ( 11005-$ 3,456): CCC removed barriers at a bargain price. Still functional. Grade A. Tarup Creek ( 11004, 11011, 11015, 16, 17-$ 77,024): CCC has a plan for the creek and instream treatments done under contract by Inter- Fluv Inc. The work outlined in the plan is now completed, and is of very high quality and design for the most part. The work involved barrier modification, instream structures, revegetation upslope as well in the riparian zone, and some upslope erosion control ( one site upslope was quite major, in fact). Tarup, regardless of all these improvements, has a low flow access problem in its delta. Grade B. Pine Creek ( 10019, 20-$- 0-): Not reviewed. Various streams ( 11019- 20-$ 550,000): This is the CCC operation fund for the Lower Klamath program. This ongoing general fund was not deemed suitable for field review or rating. However, our general observation of the CCC/ DFG Lower Klamath program has certainly produced a positive impression of their work and approach. - Review Comments- MIDDLE KLAMATH SUBBASIN: Beaver Creek ( 6000- 05, 6035, 6053, 6065, 6066-$ 124,400): The boulder cluster groups and weirs constructed on Beaver Creek are not well utilized at this time. Silts and sediments nave impacted the quality of the gravel associated with the structures to the extent that some cementing has occurred. Therefore, it is believed that utilization by spawners has also been effected. The structures designed for the provision of rearing habitats have done better, and some of course do both, some neither. Grade C, The rearing facility ( 6035) was closed in 1985, but there is now talk of re- opening it. 1980- 84 releases averaged 29,423 yearling chinook of Iron Gate origin. Grade C. The gravel seeding occurred in 1985 ( 6052) and no evaluation was considered possible in 1989, nor was any proffered by staff. The two screens ( 6065- 66) are functional, but require regular upkeep and periodic thorough maintenance. Grade B. Bluff Creek ( 6036-$- 0-): This is one of the Klamath system's highest production cooperative rearing facilities. It has averaged 66,462 chinook yearlings for the past three years. These fish are of Iron Gate origin. Although adult runs are up in Bluff Creek, there is little baseline data, and until the current brood no CWT's were done on the ponded fish. Grade B. Bogus Creek ( 6046- 47, 6053- 54, 6061-$ 94,750): Bogus Creek is heavily utilized by naturally spawning chinook of Iron Gate Hatchery origin as well as by stocks of its own. The projects designed to provide more and/ or better gravels for these fish have met with apparent success, since in almost all cases the projects are used by the spawners, but so is everything else. What that means in real incremental gains that can be credited to particular habitat treatments is therefore difficult to assess. CWT and DSM evaluation programs are ongoing. Grade C. Camp Creek ( 6037-$- 0-): This rearing facility switched from Iron Gate chinook stocks to natal stocks in 1987. Yearling releases dropped from an average of 27,533 to 14,573 after the change. This can be attributed to the difficulty in trapping adults in an open, high discharge system. Still, the fact that they are now utilizing later running stocks that are adapted to Camp Creek's flow regime and conditions counts for a great deal. The natal brood have been marked with alternating maxillary clips ( right one year, left the next) prior to release and some have been recovered as adults. Grade B+. China Creek ( 6008- 09-$ 9,300): Not reviewed. Report is that the access is good throughout the stream now. No report on the status of the structures. - Review Comments- Clear Creek ( 6010, 6068- 69-$ 66,400): Fish and Game's barrier removal is providing access successfully. Report is that access is good throughout Clear Creek at this time. Grade B. Coon Creek ( 6056-$ 30,000): This ladder passes steelhead, but DFG is not certain about coho. It also requires some light upkeep. Grade B. Cottonwood Creek ( 6049-$ 22,966): Gravel placed on these weirs needs to be re- seeded periodically at the cost of $ 2,000 each time. Grade D. ( 6057-$ 6,000): Not reviewed. ( 6055-$ 5,000): Ladder is on line and working well. Grade B. ( 6058- 60-$ 29,500): These screens are all on line and operational, but require light periodic maintenance which is conducted by the Yreka Screen Shop on a rotating basis. Grade B. ( 6070-$ 1,200): The potholes blasted to trap gravel have trapped sand instead, so the goal of creating spawning habitat was not met. However, fry usage and survival seem to be good in the resultant pools. Not a high cost project. Grade C. ( Total Cottonwood Creek budget: $ 64,666) Di1lon Creek ( 6071-$ 5,000): This functional project opened five miles of good habitat now utilized by steelhead and Chinook. Grade A. Doolittle Creek ( 6011-$ 2,300) : The treated log jam has not reformed and access is still good for steelhead. Grade C. Elk Creek ( 6012- 14-$ 41,000): The boulder weirs and clusters are now all installed and need flows for evaluation of performance. ( 6034, 6045-$ 10,000) : The washout pond has averaged 31,205 released Iron Gate chinook yearlings since 1984. Grade B. ( Total Elk Creek budget: $ 51,000) Grider Creek ( 6015- 16, 6038-$ 18,500): The falls are now passing fish successfully. Grade A. The boulder weirs have been successful in trapping spawning gravel and are being used by chinook. Grade A. The ponds have grown an average of 34,426 Iron Gate chinook yearlings since 1987. Grade B. Horse Creek ( 6062- 64, 6074-$ 35,000): The three screens are installed and operational, but require light maintenance. Yreka Screen Shop provides this on an alternating basis. Grade B. The log jam is no longer an access problem. Grade A. ( Extant diversion dam is a major problem on this creek) Humbug Creek ( 6017- 18-$ 5,300): The boulder weirs are not successful and are physically failing. Grade F. The log weirs have worked well and are providing spawning and rearing habitat. Grade A. In any event, ten miles of good quality habitat are blocked to salmonids by dredge tailings in lower Humbug Creek. - Review Comments- Independence Creek ( 6019-$ 5,000): The stream's mouth is still open and fish access it. Grade B. Indian Creek ( 6006, 6020- 28, 6039- 40, 6067, 6072~$ 200,600): AH modified former barriers are now passing fish. Grade A. The recent instream structures all appear to be performing to design; biological evaluation is underway now. Grade B. The spawning channel is used extensively by steelhead, and to a lesser extent by coho, but not by chinook. It is also a maintenance item ( ie. supplemental gravel). Grade D. The rearing ponds have averaged 74,134 Iron Gate yearlings since 1985. Grade B. Irving Creek ( 6029-$ 9,300): The use of small boulders to construct inadequately sized structures resulted in no net gain from this project. Grade F. Iron Gate Hatchery ( 6033-$-?-): The hatchery is modifying its operations to better cope with problems associated with temperatures, density, and release timing according to the hatchery manager. Grade C. Badger Flat and Tree of Heaven ( 6050- 51-$ 136,000): These spawning channels have both been unsuccessful due to design flaws. They require constant maintenance which is not possible during usage. Gravel seeding is an ongoing project. Grade F. Little Bogus Creek ( 6048-$ 20,000): These seeded weirs were not reviewed, but they are reported to be intensely utilized by spawners. However, some maintenance is also required. Pearch Creek ( 6041-$- 0-): These ponds are operated by the Orleans Rod and Gun Club and have good public involvement and educational value. About 9,000 steelhead of Salmon River origin are reared here. A lot of enthusiasm and local stocks. Grade A. Red Cap Creek ( 6042-$- 0-): This rearing pond has averaged 37,862 Iron Gate chinook yearlings since 1985 and is operated in a system that has also had significant habitat improvement projects recently completed. A CWT program would help evaluate both of these aspects of the Red Cap Creek endeavor. Grade B. Seiad Creek ( 6030- 31, 6073-$ 5,100): The barrier project has been successful. Grade A. The weir projects were not found and therefore not reviewed. Thompson Creek ( 6032, 6043-$ 5,000): The rearing ponds were closed in 1985. The instream structures were not reviewed. West Branch Creek ( 6007-$ 5,500): The weirs are used by steelhead for spawning, according to local observers; they seem functional. Grade C. - Review Comments- Wilson Creek ( 6007-$- 0-): This private rearing facility was not reviewed. According to locals, it is not in use at this time. SALMON RIVER: Black Bear Creek ( 5000-$ 11,000): This USFS project successfully provided access for steelhead into the creek, and it is currently being utilized. Grade A. Kelly Gulch ( 5002- 03-$ 9,500): This project was not reviewed, but USFS staff reported that the barrier was still not passing all fish attempting to access the system. Their evaluation is underway now. Knownothing Creek ( 5004- 06, 5021-$ 153,114): The removal of the diversion dams and other barriers resulted, in doubling the chinook and coho runs into the creek. Grade A. The weirs ( 5006*) were not completed at the time of the review. Delays were incurred because the rock was overshot resulting in boulders too small for the structures. Grade F. Nordheimer Creek ( 5007, 5008-$ 90,000): The log weirs ( 5007) failed. Grade F. The fishway ( 5008) is successful and passing fish. Grade A. Salmon River ( 5023, 5024-$ 8,000): This selective barrier was modified at a very reasonable cost and has improved access for al1 fish. Grade A. East Fork Salmon River ( 5013-$ 60,000): This project was not reviewed; USFS is evaluating now. South Fork Salmon River ( 5009- 12, 5014- 15, 5022, 5001-$ 176,200): ( 5009) This natal stock bioenhancement facility was located at a site with poor water temperature conditions for intense fish culture. Broodstock acquisition was also very difficult. The facility is now closed ( equipment will be relocated in the watershed, if possible). The project released 36,667 natal chinook smolts in the period from 1985 to 1987. Grade D. The boulder group projects were undergoing evaluation during the review period for biological response. The initial physical evaluation was not conclusive because many of the projects had not been subject to higher flows. Grade C. ( 5022) The " rough passage" area currently allows fish to pass without undue struggle. Grade B. ( 5001) The Blind Horse Creek weirs have not all been successful in providing spawning habitat. Many are trapping silt rather than spawning gravel. Rearing habitats are being provided by most of them, however. Grade D. - Review Comments- Specimen Creek ( 5016-$ 500): Steelhead now pass the treated log jam barrier. Another jam has formed above this site and requires monitoring and possible modification. Grade B. St. Claire Creek ( 5017- 20-$ 15,000): Steelhead now pass the modified barrier. The log weirs are holding gravel and in use by spawners. Juvenile cover is good associated with the weirs as well as the cover elements used in the project. The boulder weirs and clusters are also in place and in use. Grade A. SCOTT RIVER: Scott River and tribs. ( 4031- 4334 [ not inclusive]-$ 2, "* 15,810) : These Soil Conservation District projects primarily involved placing rip- rap armor at 304 different sites in the upper Scott system. Not all were reviewed, and although the rock is stable and in place, many were found to lack streamside vegetation that would provide important shade and cover for the stream and aquatic life. Some others were buried in decomposed granite, sand or silt and therefore had little benefit for fish by way of providing complex micro- habitats. The value of these projects would be much greater if some of these items were addressed. Grade C. French Creek ( 4001, 4016- 18-$ 32,100): The sediment check dam initially filled in one storm event. It was excavated but refilled during the next runoff event. A high maintenance approach that treats the symptoms of the watershed's chronic erosion problem. Grade F. The screens are all in place and functional, but are dependent upon periodic light upkeep provided by the Yreka Screen Shop. Grade B. Kelsey Creek ( 4002- 04-$ 147,500): The weirs work well and are used by all species for spawning and rearing. Grade A. The USFS spawning channel has not performed as hoped. Problems have occurred relating to channel liner failure. The average number of pairs using the channel during the period 1985- 88 were: nine chinook, three coho, and twelve steelhead. In 1989 no usage was observed. It is also a very costly installation. Grade D-. Kidder Creek ( 4020- 21-$ 26,000): Both screens are in place and functional, but are dependent upon periodic maintenance provided by the Yreka Screen Shop. Grade B. Patterson Creek ( 4019-$ 9,000): This screen is in place and functional, but is dependent upon periodic maintenance provided by the Yreka Screen Shop. Grade B. - Review Comments- Scott River ( 4005- 06, 4012- 15-$ 94,800): Although the gravels were ' cleaned' the sedimentation problem returned the next year, This treatment does not address the problem, but rather the symptoms and would require constant maintenance. Grade F. The boulder groups were not installed after gauging the rapid sedimentation rate. The four screens are in place and functional, but are dependent upon periodic maintenance provided by the Yreka Screen Shop. Grade B. East Fork Scott River ( 4010- 11-$ 20,000): These two screens are in place and functional, but are dependent upon periodic maintenance provided by the Yreka Screen Shop. Grade B. Shakleford Creek ( 4009, 4022- 4030 incl., 4323, 4329-$ 343,720): ( 4009) The bank armor was not surveyed, but is reported to be stabilizing the soft banks. The fishery benefits are not known, ( 4022- 30) These nine screens are in place and functional, but are dependent upon periodic maintenance provided by tne Yreka Screen Shop, Grade B. ( 4323, 4329) The rip- rap bank armor is in place, but needs vegetation and cover elements added to increase fishery values. Grade C. Thomkins Creek ( 4007- 08-$ 6,500): The weirs are installed but are not highly utilized because of the recruited fine sediments now accumulated on them. Grade D. The fishway has provided access and is currently functional. Grade B. SHASTA RIVER: Parks Creek ( 3018-$ 42,000): These four screens are in place and functional, but are dependent upon periodic maintenance provided by the Yreka Screen Shop. Grade B. Shasta River ( 3000- 04, 3005- 08, 3009- 17-$ 519,000): ( 3000- 04) These weirs have deteriorated over the past few years due to the use of undersized boulders in construction. Only about 10% of the effective structures remain. In 1989 only 32 redds were observed on the weirs. Very expensive ($ 363,000) spawning gravel. Grade D. The four fishways ( 3005- 08-$ 17,000) are all currently passing fish. Grade B. The nine screens ( 3009- 17-$ 139,000) are in place and functional, but are dependent upon periodic maintenance provided by the Yreka Screen Shop. Grade B. 12 0140402500 UPPER KLAMATH RIVER: Fal1 Creek ( 2000-$- 0-): The Fall Creek hatchery facility is on line and ready to augment Iron Gate's production. The site has very good water quality and can be instrumental in relieving crowding problems at Iron Gate.
-
5443. [Image] Soil survey of Crater Lake National Park, Oregon
ill. (some col.), maps (some col.); 13 folded maps tipped in; Also available via Internet as of April 20, 2005; Includes data tables; Includes bibliographical references (p. 151-153) and glossary (p. 1...Citation Citation
- Title:
- Soil survey of Crater Lake National Park, Oregon
- Author:
- United States Department of Agriculture, Natural Resources Conservation Service, in cooperation with United States Department of the Interior, National Park Service
- Year:
- 2008
ill. (some col.), maps (some col.); 13 folded maps tipped in; Also available via Internet as of April 20, 2005; Includes data tables; Includes bibliographical references (p. 151-153) and glossary (p. 155-163)
-
5444. [Image] Klamath Project 2001 biological opinion
Fact sheet summarizing what a biological opinion is and how one is related to the issues surrounding the Klamath Project.Citation -
5445. [Image] Evaluation of instream fish habitat restoration structures in Klamath River tributaries, 1988/1989
Annual Report For Interagency Agreement 14-16-0001-89508 EVALUATION OF INSTREAM FISH HABITAT RESTORATION STRUCTURES IN KLAMATH RIVER TRIBUTARIES 1988/1989 by A.D.Olson and J.R. West USDA-Forest Service, ...Citation Citation
- Title:
- Evaluation of instream fish habitat restoration structures in Klamath River tributaries, 1988/1989
- Author:
- Olson, A. D.
- Year:
- 1989, 2008, 2006
Annual Report For Interagency Agreement 14-16-0001-89508 EVALUATION OF INSTREAM FISH HABITAT RESTORATION STRUCTURES IN KLAMATH RIVER TRIBUTARIES 1988/1989 by A.D.Olson and J.R. West USDA-Forest Service, Klamath National Forest 1312 Fairlane Road, Yreka, CA 96097 ABSTRACT Ten instream fish habitat techniques were evaluated to determine which most effectively restored salmonid spawning and/or rearing conditions. Structure stability was estimated based on how intact each structure remained (by percent) and its age, we then projected useful life for each structure type. Cost in 1989 dollars was used to determine cost per unit habitat area provided. Observed use by spawners was used to estimate total number of redds per structure (over its life). Cost of providing spawning habitat (cost per redd) was calculated by dividing estimated total redds by structure cost. Habitats resulting from instream structures were classified using the modified Bisson method and we determined the influence zone of each structure using physical variables to define habitat area. Structures were biologically sampled using direct underwater observation techniques described by Hankin and Reeves1 (1989). Two person dive teams used a "two-pass" method to enumerate and classify salmonids by species and age-class (0+, 1+ or older juveniles, and adults), noting the presence of other species. Fish use of structure affected habitat (post-modification) was compared to use of habitats like those present prior to structure placement (pre-modification). Comparison of "pre-modification" and "post-modification" fish standing crops resulted in a "net fish difference" which was divided by structure cost, yielding "cost per fish reared11. Boulder weirs, the most expensive structures investigated, did not affect enough surface area to make cost per unit of affected habitat reasonable. Cabled cover logs and digger logs (lowest cost structures) were very cost effective at altering physical habitat condition. We believe cost of physically modifying habitat area is only one factor that is important enough to effect success or failure of a large scale habitat restoration program. Assuming all other factors are of equal weight, lowest cost structures can provide the "best value". Modification prescribed to restore stable spawning habitat needs close scrutiny. We believe it is essential to know how the existing habitat is used by spawners by conducting spawning area use surveys which identify redd location and quantify habitat available during each spawning period. Boulder deflectors were best utilized by Chinook salmon spawners, however chinook spawner use of "traditional" structures (weirs backfilled with gravel) was disappointing. Backfilling of instream structures with suitable gravel is a practice that should be discontinued. Steelhead spawner use of structures which result in "pocket water" type spawning areas were heavily used. This habitat configuration proved most desirable when woody object cover was readily available to the spawners. The highest steelhead spawner use was associated with boulder groups with wood and boulder/rootwad groups. We found rearing structures which provided high habitat and cover diversity received the best response from juvenile fish. We observed fish use over one summer and saw dramatic unpredictable use changes even through this short time period. Fish rearing needs during other seasons may differ substantially from summer needs, therefore, suitability of modified habitat probably also changes. Digger logs, one of the least costly and simplest structures, provided the best increase in fish standing crop (fish/m2) for the lowest cost. We believe digger logs were well used by rearing fish because they are one of the most natural restoration structures investigated. Other structures which were well used (small weirs, deflectors, and boulder groups with attached wood) also seem to closely duplicate naturally productive habitats. Higher velocity habitat types associated with boulder groups with wood, boulder rootwad groups, and boulder deflectors were selected by juvenile steelhead and chinook salmon. Providing overhead cover, especially if it extends into the water where it may also be used as object cover, seemed most valuable for juvenile steelhead and salmon if it was placed in a habitat type which would normally receive high fish use. Placement of object cover in slow velocity areas (pool and glide edges) had questionable value for summer rearing habitat restoration, however we do not know what value these structures may have during colder water high flow periods when fish seek slow velocity, densely-covered habitats. We defined the most cost effective method as one meeting restoration objectives, providing the greatest increase in fish use (per surface area or volume), over the longest time period, for the lowest cost. We rank structures evaluated in this study (from most cost-effective to least cost effective) as follows: Digger Logs, Boulder deflectors, Small Boulder Weirs, Boulder Groups with Woody Cover, Free Boulder Weirs, Large Boulder Weirs, Boulder Groups, Boulder/Rootwad Groups, Boulder/Rootwad Deflectors, Small Boulder Weirs, and Cabled Cover Logs.
-
SUMMARY The U.S. Geological Survey's program for geologic and hydrologic evaluation of physiographic provinces to identify areas potentially suitable for locating repository sites for disposal of high-level ...
Citation Citation
- Title:
- Geologic and hydrologic characterization and evaluation of the Basin and Range Province relative to the disposal of high-level radioactive waste [part 1 introduction and guidelines]
- Author:
- Bedinger, M. S.; Sargent, Kenneth A.; Reed, J. E.
- Year:
- 2008, 2005
SUMMARY The U.S. Geological Survey's program for geologic and hydrologic evaluation of physiographic provinces to identify areas potentially suitable for locating repository sites for disposal of high-level nuclear wastes was announced to the Governors of the eight States in the Basin and Range Province on May 5, 1981. Representatives of Arizona, California, Idaho, New Mexico, Nevada, Oregon, Texas, and Utah, were invited to cooperate with the Federal Government in the evaluation process. Each Governor was requested to nominate an Earth scientist to represent the State in a province working group composed of State and U.S. Geological Survey representatives. This report, Part I of a three-part report, provides the background, introduction and scope of the study. This part also includes a discussion of geologic and hydrologic guidelines that will be used in the evaluation process and illustrates geohydro-logic environments and the effect of individual factors in providing multiple natural barriers to radionuclide migration. Part II is a reconnaissance characterization of the geologic and hydrologic factors to be used in the initial screening of the Basin and Range Province. Part III will be the initial evaluation of the Province and will identify regions that appear suitable for further study. The plan for study of the Province includes a stepwise screening process by which successively smaller land units are considered in increasing detail. Each step involves characterization of the geology and hydrology and selection of subunits for more intensive characterization. Selection of subunits for further study is by evaluation of geologic and hydrologic conditions following a set of guidelines. By representation on the Province Working Group, the States participate in a consultation and review role in: (1) Establishing geologic and hydrologic guidelines, and (2) characterizing and evaluating the Province. The States also participate in compilation of geologic and hydrologic data used in characterizing the Province. The current (1983) needs for a high-level radioactive waste repository include: (1) Disposal in a mined repository; (2) re- trievability of the waste for as much as 50 years; and (3) confidence of isolation of the waste from the accessible environment. Isolation of the waste needs to be assured using geologic and hydrologic conditions that: (1) Minimize risk of inadvertent future intrusions by man; (2) minimize the possibility of disturbance by processes that would expose the waste or increase its mobility; and (3) provide a system of natural barriers to the migration of waste by ground water. The guidelines adopted by the Province Working Group are designed to provide a standard with which these conditions can be compared. The guidelines can be grouped into four principal categories: (1) Potential host media, (2) ground-water conditions, (3) tectonic conditions, and (4) occurrence of natural resources. Ideally the host medium constitutes the first natural barrier to migration of radionculides. The host medium ideally should be a rock type that prevents or retards dissolution and transport of radionuclides. Rocks in both the saturated and unsaturated zones may have desirable characteristics for host media. Rocks?other than the host?in the ground-water flow path from the repository ideally should be major barriers to radionuclide migration. Confining beds of low permeability might be present to retard the rate of flow between more permeable beds. Additionally, sorption of radionuclides by materials such as clays and zeolites in the flow path can further retard the flow of radionuclides by several orders of magnitude. Tectonic conditions in an area should not present a probable cause for exhumation or increased mobility of radioactive waste. Natural resources are a factor for consideration because of the problem of future human intrusion and exposure to radioactivity in the quest for minerals, oil, gas, water, and geothermal resources. The ultimate evaluation of the suitability of a geohydrologic environment for developing a mined repository needs to assess all geologic and hydrologic characteristics and their interaction in providing confidence that a geohydrologic environment will effectively isolate radionuclides from human access. Several hypothetical settings with typical geohydrologic conditions in the Basin and Range Province are used to illustrate the effect of multiple barriers in the isolation of radionuclides.
-
EXECUTIVE SUMMARY FOR THE BULL TROUT RECOVERY PLAN Current Species Status The bull trout (Salvelinus confluentus) in the coterminous United States was listed as threatened on November 1, 1999 (64 ...
Citation Citation
- Title:
- Bull Trout, Salvelinus Confluentus... Draft Recovery Plan, Chapter 1, Introduction...
- Author:
- U.S. Fish and Wildlife Service
- Year:
- 2003, 2008, 2005
EXECUTIVE SUMMARY FOR THE BULL TROUT RECOVERY PLAN Current Species Status The bull trout (Salvelinus confluentus) in the coterminous United States was listed as threatened on November 1, 1999 (64 FR 58910). Earlier rulemakings had listed distinct population segments of bull trout as threatened in the Columbia River, Klamath River, and Jarbidge River basins (63 FR 31647, 63 FR 42757, 64 FR 17110). Bull trout distribution, abundance, and habitat quality have declined rangewide. Several local extirpations have been documented, beginning in the 1950fs. Bull trout continue to occur the Klamath River, Columbia River, Jarbidge River, St. Mary-Belly River, and Coastal-Puget Sound, in the states of Idaho, Montana, Nevada, Oregon, and Washington. Habitat Requirements and Limiting Factors Bull trout have more specific habitat requirements than most other salmonids. Habitat components that influence bull trout distribution and abundance include water temperature, cover, channel form and stability, substrate for spawning and rearing, and migratory corridors. Bull trout are found in colder streams and require colder water than most other salmonids for incubation, juvenile rearing, and spawning. Spawning and rearing areas are often associated with cold-water springs, groundwater infiltration, and/or the coldest streams in a watershed. Throughout their lives, bull trout require complex forms of cover, including large woody debris, undercut banks, boulders, and pools. Alterations in channel form and reductions in channel stability result in habitat degradation and reduced survival of bull trout eggs and juveniles. Channel alterations may reduce the abundance and quality of side channels, stream margins, and pools, which are areas bull trout frequently inhabit. For spawning and early rearing bull trout require loose, clean gravel relatively free of fine sediments. Because bull trout have a relatively long incubation and development period within spawning gravel (greater than 200 days), transport of bedload in unstable channels may kill young bull trout. Bull trout use migratory corridors to move from spawning and rearing habitats to foraging and overwintering habitats and back. Different habitats provide bull trout with diverse resources, and migratory corridors allow local populations to connect, which may increase the potential for gene flow and support or refounding of populations. Declines in bull trout distribution and abundance are the results of combined effects of the following: habitat degradation and fragmentation, the blockage of migratory corridors, poor water quality, angler harvest and poaching, entrainment (process by which aquatic organisms are pulled through a diversion structure or other device) into diversion channels and dams, and introduced iv normative species. Specific land and water management activities that continue to depress bull trout populations and degrade habitat include dams and other diversion structures, forest management practices, livestock grazing, agriculture, road construction and maintenance, mining, and urban and rural development. Some threats to bull trout are the continuing effects of past land management activities. Organization and Development of the Recovery Plan Because bull trout in the coterminous United States are widely distributed within a large area, the recovery plan is organized into multiple chapters. This introductory chapter (Chapter 1) describes our overall recovery strategy for the species, defines recovery, and identifies recovery actions applicable for all listed bull trout in the coterminous United States. Each successive chapter focuses on bull trout in specific geographic areas (recovery units), and describes conditions, defines recovery criteria, and identifies specific recovery actions for the recovery unit. Recovery Objectives The goal of this recovery plan is to describe the actions needed to achieve the recovery of bull trout, that is, to ensure the long-term persistence of self-sustaining, complex interacting groups (or multiple local populations that may have overlapping spawning and rearing areas) of bull trout distributed across the species' native range. Recovery of bull trout will require reducing threats to the long-term persistence of populations, maintaining multiple interconnected populations of bull trout across the diverse habitats of their native range, and preserving the diversity of bull trout life-history strategies (e.g., resident or migratory forms, emigration age, spawning frequency, local habitat adaptations). To recover bull trout, the following four objectives have been identified: ? Maintain current distribution of bull trout within core areas as described in recovery unit chapters and restore distribution where recommended in recovery unit chapters. ? Maintain stable or increasing trend in abundance of bull trout. ? Restore and maintain suitable habitat conditions for all bull trout life history stages and strategies. ? Conserve genetic diversity and provide opportunity for genetic exchange. ? These objectives apply to bull trout in all recovery units. Additional objectives may be necessary to achieve recovery in some recovery units and will be identified in the respective recovery unit chapters. Recovery Criteria Criteria are established to assess whether recovery objectives are being achieved. Criteria specific to each recovery unit are defined in each recovery unit chapter. Individual chapters may contain criteria for assessing the status of bull trout and alleviation of threats that are unique to one or several recovery units. However, every recovery unit chapter will contain criteria that address the following characteristics: ? The distribution of bull trout in identified and potential local populations in all core areas within the recovery unit. ? The estimated abundance of adult bull trout within core areas in the recovery unit, expressed as either a point estimate or a range of individuals. ? The presence of stable or increasing trends for adult bull trout abundance in the recovery unit. ? The restoration of passage at specific barriers identified as inhibiting recovery. We expect recovery of bull trout to be a dynamic process occurring over time. The recovery objectives are based on our current knowledge and may be refined as more information becomes available. Some local populations of bull trout, and possibly core area populations, may be extirpated even though recovery actions are being implemented. If reestablishment of recently extirpated populations is not feasible or practical, recovery criteria for a given recovery unit will be revised on a case-by-case basis. Meeting the four recovery criteria is not intended to be precluded where localized extirpations of bull trout are offset by sufficiently strong improvements in other areas of a recovery unit in meeting the four recovery objectives. The determination of whether a distinct population segment of bull trout is recovered will rely on an analysis of the overall status of the species, threats to the species, and the adequacy of existing regulatory and conservation mechanisms. For example, it may be possible for the Columbia River Distinct Population Segment, which has 22 recovery units, to be recovered prior to all recovery unit criteria being met in all recovery units. Success in accomplishing the recovery VI criteria will be reviewed and considered for the impacts both within a recovery unit and throughout a distinct population segment. Actions Needed Specific tasks falling within the following seven categories will be necessary to initiate recovery within all recovery units: ? Protect, restore, and maintain suitable habitat conditions for bull trout. ? Prevent and reduce negative effects of normative fishes and other normative taxa on bull trout. ? Establish fisheries management goals and objectives compatible with bull trout recovery and implement practices to achieve goals. ? Characterize, conserve, and monitor genetic diversity and gene flow among local populations of bull trout. ? Conduct research and monitoring to implement and evaluate bull trout recovery activities, consistent with an adaptive management approach using feedback from implemented, site-specific recovery tasks. ? Use all available conservation programs and regulations to protect and conserve bull trout and bull trout habitats. ? Assess the implementation of bull trout recovery by recovery units and revise recovery unit plans based on evaluations. Recovery Priority Number The recovery priority number for bull trout in the coterminous United States is 9C, on a scale of 1 to 18, indicating that (1) taxonomically, these populations are distinct population segments of a species, (2) the five populations are subject to a moderate degree of threat(s), (3) the recovery potential is high, and (4) the degree of potential conflict during recovery is high. vrr Estimated Cost of Recovery The total cost estimate of recovery for bull trout in the coterminous United States is presented in the individual recovery unit chapters. The costs presented in each chapter are attributed to bull trout conservation but other species will also benefit. Date of Recovery Expected time to achieve recovery varies among recovery units because of differences in bull trout status, factors affecting bull trout, implementation and effectiveness of recovery tasks, and responses to recovery tasks. Achieving bull trout recovery in all recovery units will be a complex process that will likely take 25 years or more. vin
-
CONTENTS STATEMENTS Page American Farm Bureau Federation 26963 Bell, Craig, Executive Director, Western States Water Council 26945 Domenici, Hon. Pete V., U.S. Senator From New Mexico 2691 Gaibler, Floyd, ...
Citation Citation
- Title:
- Western water supply : hearing before the Committee on Energy and Natural Resources, United States Senate, One Hundred Eighth Congress, second session, to receive testimony regarding water supply issues in the arid West, March 9, 2004
- Author:
- United States. Congress. Senate. Committee on Energy and Natural Resources
- Year:
- 2004, 2005
CONTENTS STATEMENTS Page American Farm Bureau Federation 26963 Bell, Craig, Executive Director, Western States Water Council 26945 Domenici, Hon. Pete V., U.S. Senator From New Mexico 2691 Gaibler, Floyd, Deputy Undersecretary for Farm and Foreign Agricultural Services, Department of Agriculture 26932 Grisoli, Brigadier General William T., Commander, Northwestern Division, U.S. Army Corps of Engineers 26918 Hall, Tex G., President, National Congress of American Indians, and Chair man, Mandan, Hidatsa and Arikara Nation 26950 Raley, Bennett, Assistant Secretary, Department of the Interior 2695 Uccellini, Dr. Louis, Director, National Centers for Environmental Prediction, National Oceanic and Atmospheric Administration 26926 APPENDIX Responses to additional questions 2620 67
-
5449. [Image] Water resources data. Oregon. Water Year 2003
-