Search
You searched for:
Start Over
Photos
Remove constraint Photos
Database
Klamath Waters Library
Remove constraint Database: Klamath Waters Library
« Previous | 3,671 - 3,680 of 4,014 | Next »
Search Results
-
P12-201-4429 NA Klamath Project, OR-CA. Ady Canal, U.S. Hway 97 and SPRR siphon--View looking east of west portal of tunnel under Hwy 97. Bobcat loader. Contractor's ventilation system and channel iron ...
Citation -
P12-201-4449 NA Klamath Project, OR-CA. Concrete repairs at Plant FF 2nd left front wall. Had excessive amount of rock pockets due to apparent faulty air powered vibrators. Cold joint due to E-Con Placer ...
Citation -
3673. [Image] View of field on the Lower Klamath Lake, showing results of unsuccessful attempt at farming peat soils
KP-1270-R2 - Klamath Project - Region II. Twelve to eighteen inches of top soil has been removed by wind action disclosing the diatomaceous material in the subsoil. Notice pattern of plow soles. September ...Citation -
3674. [Image] Louis Montemeyor of San Antonio, Texas, takes a break from his labors of weeding an onion patch near Stronghold, California
KP-1190-R2 - Klamath Project. Region II. Montemeyor is a migrant agricultural worker who is, at the present time, staying at the surplus WRA (War Relocation Authority) camp at Newell, Calif. He likes ...Citation -
3675. [Image] KSD Enlargement, Lower Klamath Lake Division, Specs. 200C-922 - Patterson Constr. Co., Contractor
P-12-200-4206NA Klamath Project - Oregon-California. (Caption same as P-12-200-4205, except looking northeast).Citation -
3676. [Image] KSD Enlargement, Lower Klamath Lake Division, Specs. 200C-922 - Patterson Constr. Co., Contractor
P-12-200-4215NA Klamath Project - Oregon-California. Motor grader leveling out sub-base material on road at Sta. 60±, looking north.Citation -
3677. [Image] KSD Enlargement, Lower Klamath Lake Division, Phase II Specs. 200C-954, RHC Construction, Inc., Contractor
P-12-200-4232NA Klamath Project - Oregon-California. Pumping Plant "EE" site. View of material before drilling operations for dewatering well. Note large boulders that were excavated. This material ...Citation -
3678. [Image] Sealing, Repair and Modification of Gerber Dam - Specs. 200C-888 - Dante Engineers & Contractors, Contractor
CN-12-201-390NA Klamath Project - Oregon-California. Sandblasting of concrete repair area on face of the dam; April 18, 1974; Bureau of Reclamation photo by Bill CummingsCitation -
3679. [Image] Closed Drain Construction, Tule Lake, Sump 3 Specs. 200C 910 - Patterson Constr. Co., Contractor
CN-12-201-497NA Klamath Project - Oregon-California; View of John Deere scraper making the 0.5 ft. fill over the open drains to be filled; November 1974; USBR photo by D. W. SteinCitation -
CN-12-201-520NA Klamath Project. View showing control panel at the booster pump station; May 15, 1975; USBR photo by D. W. Stein
Citation