  • 4552
    P12-201-4470 NA Klamath Project, OR-CA. Placing concrete in walls of outlet structure of FF. Concrete being pumped into forms by E Con Pacer and vibrated by electric vibrator.--PP FF; October 1977; ...
    Citation
  • 4553
    P12-201-4471 NA Klamath Project, OR-CA. Ady Canal -- Concrete is being placed in slab of inlet into syphon. Concrete is wet batched from CPI plant from Klamath Falls, OR. It is hauled out to job site in ...
    Citation
  • 4554
    P12-201-4472 NA Klamath Project, OR-CA. Another view of the PP 'E' bridge, west side. Three (3) short piling have been driven to specs.; two center piling are driven to 31' depth; November 22, 1977; USBR ...
    Citation
  • 4555
    P12-201-4473 NA Klamath Project, OR-CA. Overall view of PP E and PP EE. Taken south of flume for center canal; November 23, 1977; USBR photo by D.J. Kline
    Citation
  • 4556
    P12-201-4474 NA Klamath Project, OR-CA. View of PP 'E' bridge looking from west to east. Piling far right driven to 40' depth. Remaining piling are in to a depth of 31'. Note: Center pile caught fire due ...
    Citation
  • 4557
    P12-201-4475 NA Klamath Project, OR-CA. Spoils removed from east side of PP 'E' outlet transition for PP 'E' bridge piling. Material was removed by backhoe due to rock; November 23, 1977; USBR photo by ...
    Citation
  • 4558
    P12-201-4476 NA Klamath Project, OR-CA. Case 580C Extend-a-Hoe excavating on east side of PP 'E' outlet transition for PP 'E' bridge piling. Note: Large rock in foreground removed from excavation; November ...
    Citation
  • 520
    Photo of Link River looking upriver; June, 1904
    Citation
  • 525
    1904?
    Citation
  • 526
    1904?
    Citation