P12-201-4306 NA Klamath Project, OR-CA. Nearly completed Plant EE excavation to depth elev. ±50. Water in excavation is due to the power being off to east side wells, for approximately 30 hours; December ...
Citation -
P12-201-4307 NA Klamath Project, OR-CA. Trimming of side walls at Plant EE to better expedite a ± 1 to 1½/1 slope; December 1976; USBR photo by D. J. Kline
Citation -
P12-201-4308 NA Klamath Project, OR-CA. Gravity hammer 2500 lbs. placing pile to depth of 2-3 feet for further driving to desired depth by air hammer. Soldier pile 1'x1'x16'; December 1976; USBR photo ...
Citation -
P12-201-4309 NA Klamath Project, OR-CA. Break in earth dike holding farm land flood water. Dike located on west side of KSD. Approx. 8 man hours and 2 hrs. of Case 580 time was used; January 17, 1977; ...
Citation -
P12-201-4310 NA Klamath Project, OR-CA. Below broken ice is inlet to 48" CMP which was flooded by earthen dam breaking, causing slide gate on inlet to Center Canal flume to backseat and leak; January ...
Citation -
P12-201-4311 NA Klamath Project, OR-CA. Center Canal - backflooding against 48" slide gate, causing gate to unseat and allowed flooding of flume inlet transition; January 17, 1977; USBR photo by D. J. ...
Citation -
P12-201-4312 NA Klamath Project, OR-CA. Center Canal - existing flume outlet, where flooding exited after flowing down entire length of existing flume and flowing into flume pier excavation; January 17, ...
Citation -
P12-201-4313 NA Klamath Project, OR-CA. Center Canal - Contractor built an earth diversion dam at inlet to 48" CMP turnout located adjacent to flume inlet transition; January 17, 1977; USBR photo by ...
Citation -
P12-201-4314 NA Klamath Project, OR-CA. Center Canal - Contractor placed electric pump to remove flood water from flume inlet transition; January 17, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4315 NA Klamath Project, OR-CA. Dewatering well discharge PVC pipe broke at top of the well causing overnight flooding, with this result to Pumping Plant EE excavation; January 17, 1977; USBR photo ...
Citation