P12-201-4541NA Klamath Project, OR-CA. Plant E. Outlet Transition Bridge -- View of Gorman-Rupp jetting pump imported by contractor. Note the undersized intake and exhaust fittings; March 20, 1978; USBR ...
Citation -
P12-201-4546NA Klamath Project, OR-CA. Center Canal Flume Bridge. For safety of flume, water jet return trench was excavated from east side of pile trench to KSD. No jetting return was evident in flume ...
Citation -
P12-201-4547NA Klamath Project, OR-CA. Center Canal Flume Bridge. Jet trench excavated on north side of flume, same design as south side return trench. This trench did not work, however, as jetting ...
Citation -
P12-201-4549NA Klamath Project, OR-CA. Center Canal Flume Bridge. Wet area shows where unwanted jetting return was exiting into the west side of the drain on NE side of the flume; April 5, 1978; USBR ...
Citation -
P12-201-4550NA Klamath Project, OR-CA. Center Canal Flume Bridge. Lowered water level in flume. Refilled first jet return trench and dug a second deeper trench on an angle toward Pumping Plant E. These ...
Citation -
P12-201-4551NA Klamath Project, OR-CA. Center Canal Flume Bridge. Second return trench was cut into portions of the pile trench and worked well along with other measures to contain jet return; April ...
Citation -
P12-201-4553NA Klamath Project, OR-CA. Pumping Plant E Bridge. Contractor is moving bridge section laterally at this point; April 1978; USBR photo by D.J. Kline
Citation -
P12-201-4554NA Klamath Project, OR-CA. Pumping Plant E Bridge. Note that hillman rollers pivot for the turn under full load and with load stationary; April 1978; USBR photo by D.J. Kline
Citation -
P12-201-4555NA Klamath Project, OR-CA. Pumping Plant E Bridge. At this point contractor has travelled main traverse and is getting positioned to travel laterally with bridge section; April 1978; USBR ...
Citation -
P12-201-4556NA Klamath Project, OR-CA. Pumping Plant E Bridge. Tow line is hooked up to HD-5 cat to provide momentum to bridge section across main traverse; April 1978; USBR photo by D.J. Kline