Search
Search Results
-
201. [Image] Larval ecology of shortnose and Lost River suckers in the lower Williamson River and Upper Klamath Lake
One chapter of a seven chapter annual report from 1999 examining ecological issues regarding the shortnose and Lost River sucker populations in Upper Klamath Lake and Williamson River.Citation Citation
- Title:
- Larval ecology of shortnose and Lost River suckers in the lower Williamson River and Upper Klamath Lake
- Author:
- Oregon Cooperative Wildlife Research Unit
- Year:
- 2000, 2005
One chapter of a seven chapter annual report from 1999 examining ecological issues regarding the shortnose and Lost River sucker populations in Upper Klamath Lake and Williamson River.
-
ABSTRACT With the decreasing runs of natural fall chinook salmon* Oncorhmchus tshawytscha.inthe Klamath River basin, concerns were raised regarding the accuracy ma significance 01 me mainstem Klamath River ...
Citation Citation
- Title:
- Mainstem Klamath River fall chinook spawning Redd survey : fiscal year 1995 and 1996
- Author:
- Catalano, Mark
- Year:
- 1997, 2005
ABSTRACT With the decreasing runs of natural fall chinook salmon* Oncorhmchus tshawytscha.inthe Klamath River basin, concerns were raised regarding the accuracy ma significance 01 me mainstem Klamath River .1 chinook spawner estimates. The U.S. Fish and Wildlife Service, Coastal California Fish an - Wildlife Office (CCFWO) was funded through the Klamath River Fish and Wildlife Restoration Act (P. L.99-552) in the Fall of 1993-1996 to address this concern. The 1995 and 1996 survey season marked the third and fourth year that the CCFWO conducted investigations on the upper mainstem Klamath River to derive a reasonable estimate of natural * fall chinook spawners. A total of 339 redds were observed in the 1993 survey. In 1994 and 1995, redd counts increased to a total of 1,702 and 3,240 respectively. During the 1994 and 1995 spawning, seasons, there was evidence that unspawned surplus adult fall chinook salmon released from Iron Gate Hatchery (IGH) successfully spawned in the Klamath River. One hatchery fin clipped adult was observed spawning.30 miles downstream of the hatchery. In 1996, 1,372 redds were observed which wasa decrease of 43% from the previous year. There was complete retention of hatchery origin adults by IGH in 1996, although, the distribution of redds remained the same as previous years. With the new hatchery policy of excess return retention, mainstem escapement can now be considered a reasonable estimate of natural spawning adult chinook salmon. Reddsubstrate composition estimates remained consistent with previous spa- *:g survey data. Based upon 210 redd measurements from 1995-1996, the average redd size L ...e mainstem of the Klamath River was 9.6 nr. The average pit depth, mound depth, and adjacent depth for 1995-1996 was similar to previous survey results. Redds were most common along the wetted channel margins with numerous redds observed in side channels with suitable gravel and water velocities. Unlike 1993 and 1994 some redds were observed by 1995 and 1996 survey crews in rnid-channei areas. Recreational suction dredge mining was present throughout the survey from the confluence of Scott River downstream to the confluence of Indian Creek, although only two redds were observed on recent dredge tailings. Under the existing mining regulations, adverse impacts on redds could occur below the Scon River without protection of spawning areas.
-
203. [Image] Nitrogen and phosphorus loading from drained wetlands adjacent to Upper Klamath and Agency Lakes, Oregon
Two maps digitized separately; Includes bibliographical references (p. 44-49)Citation -
204. [Image] Progress report for investigations on Blue Creek, fiscal year 1992, Blue Creek, California
PROGRESS REPORT FOR INVESTIGATIONS ON BLUE CREEK FT 1992 ABSTRACT The U.S. Fish and Wildlife Service, Coastal California Fishery Resource Office in Arcata, California, was funded to investigate chinook ...Citation Citation
- Title:
- Progress report for investigations on Blue Creek, fiscal year 1992, Blue Creek, California
- Author:
- Chan, Jeffrey R. ; Longenbaugh, Matthew H.
- Year:
- 1994, 2005
PROGRESS REPORT FOR INVESTIGATIONS ON BLUE CREEK FT 1992 ABSTRACT The U.S. Fish and Wildlife Service, Coastal California Fishery Resource Office in Arcata, California, was funded to investigate chinook salmon roncorhvnchus tshawvtschav spavming use, juvenile salmonid emigration, and characterize stream habitats in Blue Creek, a tributary to' the Klamath River; California. Investigations began in October 1988, with this reporting period covering October 1991 through September 1992. Adult chinook spawner escapement was addressed by surveys of redds, live fish and carcasses, and by radioteleiretry. Spawner numbers were v?ry low, with only 22 redds observed in fall 1991/winter 1992. The peak count of adult Chinook was 97 fish in early November. Radiotelemetry of migrating spawners (n?8) was used to locate remote spawning areas. Emigrating juvenile Chinook salmon, steelhead trout 10. mvkissV/ coho salmon (fi. kisutchl. and coastal cutthroat trout (g. clarltiV were trapped at river kilometer (rkm) 3.35 with a rotary screw trap (screw trap). The trapping period extended from April to July for a total of 75 trapping nights. Screw trap catches totaled 10,688 chinook, 1,388 steelhead, 99 coho and 10 cutthroat. Peak Chinook emigration occurred during the week of May 17, which is consistent with the past 3 years of monitoring. A juvenile weir was operated 58 nights, and caught a total of 9,166 chinook, 1,196 steelhead, 127 coho and 1 cutthroat. The index of abundance for emigrating chinook during the 1992 juvenile trapping period was 49,590. Sixty-five percent of the juvenile chinook caught during the trapping season were marked with coded wire tags (n-12,687) and released back into Blue Creek at rkm 3.3. Mean water temperatures varied from 6.3 to 18.6 XI and stream flows ranged from 43 to 2178 eft (1.3 to 61.7 m3/?) during the Fiscal Year (FY) 1992 study season.
-
By Lorraine E. Flint, Alan L. Flint, Debra S. Curry, Stewart A. Rounds, and Micelis C. Doyle Abstract The U.S. Geological Survey (USGS) collected water? quality data during 2002 and 2003 In ...
Citation Citation
- Title:
- Water-quality data from 2002 to 2003 and analysis of data gaps for development of total maximum daily loads in the Lower Klamath River basin, California
- Author:
- Flint, Lorraine E.; Flint, Alan L.; Curry, Debra S.; Rounds, Stewart A.; Doyle, Micelis C.
- Year:
- 2004, 2006, 2005
By Lorraine E. Flint, Alan L. Flint, Debra S. Curry, Stewart A. Rounds, and Micelis C. Doyle Abstract The U.S. Geological Survey (USGS) collected water? quality data during 2002 and 2003 In the Lower Klamath River Basin, in northern California, to support studies of river conditions as they pertain to the viability of Chinook and Coho salmon and endangered suckers. To address the data needs of the North Coast Regional Water Quality Control Board for the development of Total Maximum Daily Loads (TMDLs), water temperature, dissolved oxygen, specific conductance, and pH were continuously monitored at sites on the Klamath, Trinity, Shasta, and Lost Rivers. Water-quality samples were collected and analyzed for selected nutrients, organic carbon, chlorophyll-a, pheophytin-a, and trace elements. Sediment oxygen demand was measured on the Shasta River. Results of analysis of the data collected were used to identify locations in the Lower Klamath River Basin and periods of time during 200
-
ABSTRACT This report details the third year of Klamath River basin juvenile salmonid fishery investigations and represents the second year of sampling with rotary screw traps. Two traps, positioned side ...
Citation Citation
- Title:
- Annual report, Klamath River fisheries assessment program : juvenile salmonid trapping on the mainstem Trinity River at Willow Creek and on the Klamath River at Big Bar, 1990
- Author:
- Craig, James L.
- Year:
- 1992, 2005
ABSTRACT This report details the third year of Klamath River basin juvenile salmonid fishery investigations and represents the second year of sampling with rotary screw traps. Two traps, positioned side to side, were used at both the Klamath and Trinity River sites. The traps on the Klamath River were located at Big Bar (rkm 81) and began operation in March. The traps operated until July 10 and 18 sampling 38 and 31 nights respectively. Combined catch included 333 chinook (Oncorhynchus tshawytscha) , 178 steelhead (O^ mykiss) , and 30 coho (O^ kisutch) . No appreciable difference in mean catch or mean fork length of catch between the two traps was found. Peak weekly chinook catch effort, as an indicator of peak emigration, occurred the week of June 18 to 24. A total of five (1.5%) Ad-clip chinook were captured. A contribution of 134 (40%) hatchery chinook and 199 (60%) natural stock chinook was estimated for the total chinook captured. Mean migration rate for IGH Ad-clip chinook was 5.
-
U. S. Die artment sf the Interior Bu. rea. u oP L and Management K I W ~ Falls R~& G urnw . 2795 & tdeaonAvepue, BuMng #% Klamath F~ HSO, r egon 97803 . . January 2004 Klamath Falls Resource Area Planning ...
Citation Citation
- Title:
- Klamath Falls Resource Area Planning Update, Winter 2003
- Author:
- United States. Bureau of Land Management. Klamath Falls Resource Area Office
- Year:
- 2003, 2004
U. S. Die artment sf the Interior Bu. rea. u oP L and Management K I W ~ Falls R~& G urnw . 2795 & tdeaonAvepue, BuMng #% Klamath F~ HSO, r egon 97803 . . January 2004 Klamath Falls Resource Area Planning Update Winter 2003 United States Department of the Interior BUREAU OF LAND MANAGEMENT Klamath Falls Resource Area 2795 Anderson Avenue, Building 25 Klarnath Falls, Oregon 97603- 7891 Phone: ( 541) 883- 6916 1 Fax: ( 541) 884- 2097 E- Mail Address: Username@ or. blm. gov Website: http: llwww. or. blrngov/ L. akeview/ kfra/ index. htrn KLAMATH FALLS RESOURCE AREA PLANNING UPDATE Winter 2003 The primary purpose of this Planning Update is to inform you about the activities on the Klarnath Falls Resource Area. It is my desire to keep you informed about issues, activities, and opportunities I think are important to the public. More importantly, I am seeking ideas and comments from those who may be affected by multiple- use management programs here on the resource area. This planning update is organized to make it easy for you to find projects of most interest. Projects have been arranged into categories ( i. e., Recent Decisions, New Projects, On- going Projects, and Environmental Education Activities). In addition, each of these categories is sorted by resource topics ( e. g., Lands Program, Timber Sales, etc.). The table will give you a brief description of activities occurring within the Klamath Falls Resource Area and for most projects a location. Refer to one of three maps following the table, for locations of projects. Additional information can be obtained fi- om the contact listed in the project descriptions. If you have any concerns about the proposed actions, please call the Klarnath Falls Resource Area and ask for the " Contact" person listed or the Resource Area Planner as soon as possible. The earlier you get involved, the more capability we have to adjust or change planned actions. Also be alert for news releases and public notices published in the Herald and News as projects reach stages for public involvement. If you want to provide comments to a specific environmental assessment, please send or deliver your written comments addressed to the Field Manager, Klamath Falls Resource Area, by the close of, or postmarked by the last day of the comment period. Your comments and concerns are welcomed, and could influence the final decision on these projects. I would appreciate any comments or suggestions you may have regarding this p l h i n g update or how it could be improved to make it more useful to you. Thank you for your continued interest in BLM's management of public lands. If you have any questions on this planning update, stop by the office or call ( 541) 883- 6916. Jon Raby, Field Manager Klamath Falls Resource Area BUREAU OF LAND MANAGEMENT ' KLAMATH FALLS RESOURCE AREA 2795 ANDERSON AVENUE, BLDG. # t5 KLAMATH FALLS, OR 97603 PHONE NUMBER: ( 541) 883- 6916 MAP PROJECT TITLE & DESCRIPTION LOCATION SPECIAL AREAS STATUS OF COMPLETION CONTACT REF. # AFFECTED ANALYSIS DATE CX = Categorical Exclusion, DNA = Determination of NEPA Adequacy, EA = Environmental Assessment, EIS = Environmental Impact Statement Klarnath Falls Resource Area, Winter 2003 Planning Update - Page 2 New Projects - Watershed Map # 4 T39S. R14E, Secs. 10, 11,14, 15 Norcross Vegetation Treatments - Thin ponderosa pine, remove invasive juniper, restore native vegetative communities ( grass, shrub, pine), and monitor the effects of treatment on vegetative and hydrologic resources. New Projects - Roads and Facilities None Map 1 EA in progress. Road crossing Spencer Creek Spencer Creek Culvert Replacement Spencer Watershed Riparian Fence Reconstruction New Projects - Recreation I Topsy Recreation Site Improvements - Campground water 1 T40S, R7E, Sm. 1 Map # I0 1 system and boat ramp improvements None I DNAS~ nnrrr2004 I Fall 2005 New Projects - Range Management Fall 2007 Fish passage Riparian Protection Mike Turaski in progress CX in progress Map #' DNA Spring 2004 Pitch Log Creek, Long Branch Creek, and Antelope Creek within the Gerber Block Gerber Watershed Riparian Fencing - Emposed project to construct livestock exclosure fencing along about 1.1 miles of Pitch Log Creek, 1.5 miles of Long Branch Creek, and 1.7 miles of Antelope Creek. Maintain fences as riparian exclosures or riparian pastures. Monitor effects of reduced livestock use on vegetation and streambank conditions. New Projects - Timber Management Contract - Fall 2004 Construction - 2005. Summer 2004 Riparian protection Fall 2004 Andy Hamilton Andy Hamilton Dana Eckard Jenny Creek Watershed South Gerber Block Jenny Creek Watershed South Gerber Block I I I None 1 None Jenny Creek EA - Purpose of this EA is to address a variety of forest health and restoration treatments in the Jenny Creek Watershed. Proposed treatments may include; commercial timber sales, non- commercial silvicultural treatments, riparian restoration treatments, aspen stand restoration and road restoration projects. South Gerber EA - Purpose of this EA is to address a variety of forest health and restoration treatments in the South Gerber Block area. Proposed treatments may include; commercial timber sales, non- commercial silvicultural treatments, riparian restoration treatments, juniper woodland treatments, aspen stand restoration and road restoration projects. LOCATION Recent Decisions - Lands Program 1 I I I I I Upper Spencer Creek Road Treatments - Road Upper Spencer Creek I' Implementation in July obliteration, decommissioning, realignment, improvement, T38S, R6E Sections Riparian Resenres DDRBs I 2M Mike Turaski and stream crossing removal. 15 and 23 12123103 Recent Decisions - Wildlife M Map 1 # 43 ecisions - Waters Map 1 # 21 Willow Valley Habitat Enhancement Willow Valley Warm water fishexies Implementation pending Reservoir ODFW involvement. Section 1 Exploration Quarry Expansion Drilling - Authorization for ODOT to conduct exploratory drilling in and around an existingpit to identify a source for additional mineral material. Scott Snedaker I I I I I I Recent Decisions - Fuels Treatment T40S, R6E, Sec. 1. N112NW114 Map 1 # 3 None Boundary Springs Yarding and Removal of Cut Juniper - Purpose of this project is to remove juniper boles in previously treated areas to reduce fuel accumulation and promote commercial use of juniper. None Ben Hall 1 & 2, Cerber Potholes, Sehnipps, and FIZ 95- 71 Juniper Yarding - to remove juniper boles in previously treated areas to reduce fuel accumulation and promote commercial use of juniper. Fint 360 acres yarded and material sold to Area FTZ- 1 04 utilization local mill ( REACH) that utilizes juniper. Exploration initiated as weather permits. Rebecca La& Linda Younger Mike Bechdolt Various Mike Bechdolt Klamath Falls Resource Area, Winter 2003 Planning Update - Page 3 Fuel treatment, juniper utilization DNA completed. Project on hold. BUREAU OF LAND MANAGEMENT KLAMATH FALLS RESOURCE AREA AVEl PHONE NUMBER: 2795 ANDERSON AVENUE, BLDG. # 25 ' E ( 541) 8836916 SPECIAL AREAS STATUS OF AEFECrED ANALYSIS PROJECT TITLE & DESCRIPTlON LOCATION AEFErnD COMPLETION DATE CONTACT r~ ann~ ng~ na~ ysis~ lrnp~ ernen- r Gareinoenr al RMP Evaluation~ Revision- In the final settlement agreement to the American Forest Resource Council vs. Bureau of Land Management ( BLM) litigation, the BLM is directed to revise Resource Management Plans ( RMPs) in western Oregon by December, 2008. The BLM began the revision process in 2003, evaluating current plans and developing a project preplan. Project status information will be posted on the District website. Formal scoping is expected in the second half of calendar year 2004. RMP Revision - FY 2008 None Resource Area Wide All Resources Evaluation in progress Don Homeins GerberlWillow Valley Coordinated Resource Management Plan ( CRMP) Watershed Analysis. - A local planning team of private landowners, StatelFederal land managers, and concerned citizens recommends future project implementation on private land in CRMP area. CRMP meetings/ discussions are continuing Map 1 # 5 GerberNillow Valley Watershed Completion date open-Rivate Lands ended Don Homeins Lany Frazier Wild and Scenic River designation, Area of Critical Concern, T& E spp. Map l # 28 Upper Klamath River Management Plan DEE - Develop a management plan in response to Wild and Scenic Riven Act requirements for river segment approx. 20 miles long encompassing 6,400 acres. Klarnath River - J. C. Boyle Reservoir, Oregon, to Copco One Reservoir, California Draft EIS released 511 612003. Comment period closed 8/ 13/ 2003. FEIS December 2004 Upper Klamath Basin and Wood River Wetland Resource Management Plan Amendment for the Fourmile Creek portion of this area. The purpose of this project is to amend the Upper Klamath Basin and Wood River Wetland RMP EIS to designate the Fourmile Creek area as an Area of Critical Environmental Concern. Riparian Wetland Area of Critical Environmental Concern ( ACEC) Draft EIS to be prepared. Specific schedule and completion date unknown. ACEC Evaluation submitted to District Manager, October 2000. Map 1 # 29 Fourmile Creek Wetland Lou Whiteaker Lany Frazier Draft MOU presented to the Tribal Council on 2/ 22/ 2000. Waiting for Tribal feedback. - -- Unknown Memorandum of Understanding ( MOU) between the Klamath Tribes and BLM for Coordination on Management Issues. - The proposed MOU identifies a process to coordinate tribal involvement with BLM management actions on public lands. Late- Successional Reserve ( LSR) Assessment. A single LSR Assessment was prepared to assess all 19 Unmapped LSRs designated within the resource area and develop management recommendations for these areas to restore or maintain late successional habitat. Former Tribal None Lakeview District Lands - None Draft submitted to and pending approval from the Regional Ecosystem Office ( REO). BLM lands west of Highway 97 covered by the Northwest Forest Plan Unmapped Late Successional - Reserves. Analysis is complete. - ou Whiteaker Klamath Falls Resource Area, Winter 2003 Planning Update - Page 4 2795 ANDERSON AVENUE, BLDG. # 25 KLAMATH FALLS, OR 97603 541) 8834916 STATUS OF COMPLETION DATE CONTACT AFFECTED I ANALYSIS I - Map 2 # 46 - None Map 1 -# 7 Map 1 # 22 - None Map 2 # 44 Map 2 # 30 Oak Thinning - Thin 100 acres of oak woodland to restore plant communities and reduce potential for stand replacing wildfires and overall fire management costs. Noxious Weed Treatments - contain1 reduce noxious weed populations using integrated pest management ( manual, mechanical, chemical, and biological control methods). Activities tier to KFRA Integrated Weed Control Plan ( IWCP) and EA- OR- 014- 93- 09 approved July 21, 1993. T40S, R6E, Sec. 35 T41S, R6E, Sec. 3 and 10 T41S, WE, Sec. 1 Weed- infested sites throughout the Klamath Falls Resource Area Bitterbrush Planting - - Various locations Ongoing Planning/ Analysisflmplementation - Vegetation Treatments I I I -- -- - Horton Rim I Windy Ridge Juniper Removal - Juniper treatment for fuel reduction and wildlife habitat inmovement GerberlWillow Valley Riparian Conifer Treatments - removing invasive juniper from riparian areas in the Gerber Block G& I Willow Valley Watersheds Spencer Creek Riparian Thinning- thin 80 acres of iuniverlmixed conifer T38S, R6E, Secs. 21 and 28 Clover Creek DDRB - 108 acres mechanical treatment. T. 38S, R6E, Sec. 27.34 Off Spencer Hookup Road I Document is tiered to the Northwest Area Noxious 1 Noxious Weed I Klamath River canyon/ ACEC None I Wyd Control Program Treatments occur May - EIS avvroved December I October on a vearlv I Lou mitaker Analysis in Progress. 1985: supplemented in March 1987. Analysis completion expected Spring 2004. - . basis. Mule deer winter range. Rob Roninger None I EA completed Riparian Reserves EA completed. I Ongoing - Possible in Key Watershed completion in 2004 I Mike Turaski cx completed. h j e c t in progress. Riparian, critical sucker habitat 2- 3 year implementation began Spring 2003. Ongoing Planning/ Analysis/ Implementation- Lands Treatments occur on a yearly basis. Hapa DNA completed. Bald Eagles, Survey and Manage species Map l # 8 Greg Reddell Map 1 # 17 Implementation initiated 2003 - Ongoing DNA completed in Spring 2001. Mike Turaski Map I -# 20 Map 1 -# 9 On hold for RE0 approval of LSRA - ~- - Dehlinger Trust - Residential Road ROW and easement. Bmner Land Exchange Steve Haper Bly Dump Sale ( EA No. OR- 014- 97- 01) - Purpose of # l8 this project is to sell Bly Transfer Station to Klamath Co. I of Bly'OrrgOn. Map I I None Known I Analysis in progress I Winter2004 Linda Younger T40S, RIOE, Sec. 9 South Bryant Mountain Al B ~ n eLra nd Sale Nancy Charley Trust Reciprocal Easement and ROW Klamath Falls Resource Area, Winter 2003 Planning Update - Page 5 None Unknown T41S, R13E. Sec. 14 T38S, RSE, Sec 12- 13 Reciprocal Easement Pending On hold Unknown Borders Riparian Reserve Winter 2004 Spring 2005 EA completedl Decision record pending CX completed, easement pending Linda Younger Linda Younger Spring 2004 Fall 2004 Linda Younger Linda Younger MAP PROJECT TITLE & DESCRIPTION REF. SPECIAL AREAS IC OMPLI AFFECTED Ongoing Planning/ Analysis/ Imp LOCATION ETION DATE I COMA dementation - rimber Sales I - - - Non - Non Roaming Salvage EA - The purpose is to provide NEPA coverage for timely salvage of timber mortality over the entire Resource Area. Entire Resource Area Unknown Preparing scoping letters. Spring 2004 I MI* cBechdo1t FY 04 - Baldy Salvage Timber Sale - Sale is designed to harvest windthrown trees as a result of 2003- 4 windstorms and scattered insect and disease related mortality. Anticipated volume is I . O- 1 SMMBF on 300- 500 acres. FY 04 - Matchbox Title I1 Service Contradl'imber Sale - The project consists of a Forest Health Density ManagementIUnderstory Thinning of overstocked mixed conifer stands. The sale is being designed under the Secure Rural Schools and Community Self- Determination Act of 200 - Public Law 106- 393. A service contract will be used to thin, yard, and deck trees from an overstocked mixed conifer stand. A timber sale contract will be used sell the decked material. Approximately 300 acres are scheduled for treatment resulting in about 600 MBF. Primarily in the Surveyor Mtn and Burton Butte Areas. May also include some eastside areas. Timber Sale is scheduled to be sold in Mike Bechdolt May or June of 2004 Presently marking some of the scatted salvage Matrix Contract is scheduled to be awarded in June or Mike Bechdolt July of 2004 Chase Mountain Area T. 40S., R. 7E., Sec. 9 Presently Preparing the Matrix Timber Sale Contract Proposed sale date: Summer 2005 Mike Bechdolt Riparian Reserves T38S., ME., Sec. l3,15,23, 25 and 26 Reserves! Matrix Buck Again Timber Sale - An estimated 700 acres is designed for treatment in the Spencer Creek watershed near Buck Lake. Approx. 4 MMBF to be harvested. Sale preparation. Chew Timber Sale- Approximately 1,000 acres density management understory reduction adjacent to and south of T40S. R6E, Secs. 1, 1 1,14 T40S, R7E. Secs. 3 and 5 Proposed sale date Mike Bechdolt Hwy 66 west of la math Falls. ~ aleanal~ zuendd er the Sale preparation. Spring 2004 or 2005. Topsy/ Pokegama/ Hamaker EA (# OR- 0 14- 98- 01 ). Estimated volume of 2.5 m b f . None Oneoine Plannine/ Analvsis/ Implementation - Roads and Facilities Map 1 # 77 Map # 73 Klamath Falls Resource Area, Winter 2003 Planning Update - Page 6 Sediment Traps - 30 sediment traps on BLM, USFS, and private land Map I # 6 Gcrber Road Sediment Reduction - road resurfacing and drainage improvement to reduce sediment delivery to streams in the Gerber Watershed Spencer Creek Watershed and Gerber Block Gerber Washrack- Installation of facility at Gerber Guard Station for washing equipment to control the suread of noxious weeds and overhead filling of tankers. 5 stream crossings None Gerber Guard Station Critical sucker habitat DNA completed. Sediment traps installed. Noxious weed prevention EA completed. Implementation initiated I Fall 2004 Monitoring in progress. Mike Turaski CX completed. Mike Turaski Pending funding. Bob Crumrine/ Brian McCarty - I - 1 - Map 1 # 6 Ongoing Planning/ Analysis/ Implementation - Roads and Facilities ( continued) Gerber Area Recreation Improvements - ( RMP ROD EIS 6- 2- 95, pp. 49- 50) - Project falls under corrective maintenance, improvement or replacement in the Klamath Falls RMP. Existing maintenance, improvement or replacement include: rocking and chip- sealinglpaving road system and campsites, picnic tables, barrier posts, camp host RV holding tank, hydrants, Barnes Valley Boat Ramp access road. Scott Smter Gerber Reservoir Recreation Site Gerber Area Primitive Camp and Day Use Sites Recreation Improvements. The objectives of these improvements are to update or improve existing facilities to continue to provide an enhanced recreational experience and satisfy visitor needs. T& ESpecies ( suckers and bald eagles) Scott Senter Stan H Spring, Potholes, Miller Creek, Frog Camp, Pitchlog Creek, Wildhorse, Basin, Rock Creek and Willow Valley Reservoir Map l # 6 Projects in compliance GththeKFIURMP. Determination of NEPA Adequacy completed and approved on 10128199. Wood River Wetlands Project - Remaining projects: Finish installation of fish screen on 7- mile Canal diversion structure and floating boardwalk, interpretive signs, and trail system. Surface rock dike roads from bridge to 7- mile Canal and add group interpretive site. Juniper Chip Road - Using juniper debris for biomass or by- product in Oshea ( mZ 95/ 71), and Norcross Springs. FY 2004 - Miller Creek- Potholes trail to be constructed T& E Species ( suckers) wood River Property I I Upper Klamath Basin and Wood River Wetland I A Determination of NEPA Adequacy ( DNA) completed 9/ 25/ 2000. ( Project contingent on funding) Map 1 # 25 - Map 2 # 70 FY 2004- sidewalks and pinic tables to be installed at Willow Valley Res. Wedge Watkins Joe Foran 25 miles north of Klamath Falls, Oregon T 39 8 40s. R13,14,14XE I None Known I I Stewardship contract EAcompIeted being developed. Ongoing Projects - Prescribed Burning and Fuels Treatment Wetlands Map 2 # 2 Resource Management Plan EIS; decision signed June 16,1995. Joe Foran Pending funding Short Lake Broadcast Bum - Prescribe bum approx. 280 acres outside FTZ to reduce fuel loading and risk of wildfire. T38S. R1 I E, Sec 20 & 29 - - - - - - -- - - - - - Miller Creek Mechanical Treatment - Proposal to use mechanical piling instead of prescribed buming of a~ oroximatelv I00 acres. Map 2 # 37 - T39S. R13E. Sec. 14 & 23 Analysis Completed ACEC 1 FONSl and Decision Record on 3- 24- 99. Joe Foran None Known Project delayed. EA completed Fuels Maintenance Treatments # t ( KCER - 00- 03) Treat approximately 1,200 acres to remove fire- prone brush, excessive levels of hazardous fuels ( less than 6" in diameter), and small conifers that are ladder fuels and threats to over stow trees bv crown fire.. Map 2 # I 1 Spring 2004 Klamath Falls Resource Area, east of Hwy 97. See Prescribed Fire Map for locations. None Known Dale Brush Map 2 # 62 Analysis completed. Multiple year implementation - ongoing. Mechanical Slash Treatment Project - Mechanical treatments ( shearing, chipping, or grinding) to reduce fuels and control vegetation on approx. 12,000 acres. Joe Foran Multiple Locations Resource Area Wide None / Second DNA completed. Klamath Falls Resource Area, Winter 2003 Planning Update - Page 7 Projects tasked out over a three year period - ongoing. PROJECT K. 1 TITLE & DESCRIPTIO SPECIAL AREAS STATUS OF 4 CONTACT AFFECTED ANALYSIS - Map 2 -# 39 Map 2 # 40 - Map 2 -# 42 Map 2 # 38 Map 2 # 63 Map 2 # 64 - Map 2 # 65 & # I9 Map 2 # 45 - Map 2 # 49 - Stukel98- 1 Mechanical Treatment - Mechanical piling T40S, RIOE, Sec. 10,11,14, instead of pmcribed burning of approximately 500 acres. 23,24 Stukel98- 2 Prescribed Burn - Prescribe bum approx. 3,000 acres to: Reintroduce fire to restore plant communities, while reducing the potential for stand-replacement wildfires and overall fire management costs. T40S, RIOE, Sec. 12,13,24 T40S, RllE, Sec. 7& 18 HamakerIChase Fuels Treatment - Reduce Fuels on T40S, R8E 4000 acres south of Hwy 66 I Stiles Spring Prescribed Burn - Project purpose to bum approximately 1,000 acres to: Reinduce fire to restore sustainable function and structure to plant communities, while reducing the potential for stand- replacement wildfires, and reducing overall fire management costs. Stukel98- 7 & 9 Prescribed Burns - Prescribe bum approximately 525 acres to: reintroduce fire to restore plant communities, reduce overall fire management costs and the potential for stand- replacing wildfires. Statelinel Holbmk Prescribed Bums - Presmie bum approximately 4.000 acres to reduce fuel loading and risk of catastrophic wildfire. T37S, RIOE, Sec. 3- 5,9- 11, 14- 15 T40S, RllE, Sec5 & 6 T. 40S, R15 E., T. 41S, RISE. -- Big Adobe Prescribed Burn - Prescribe bum approximately 6,700 acres to reduce fuel loading and risk of catastrophic wildfire ( includes Wild Midway Rx Bum) Range- Juniper Treatment - Hazardous fuel reduction, T40S. R12E. Sec. 1 1 using mechanical and prescribed fire methods. T41 S, RISE Upper Swan Prescribed Burn - Project purpose: bum approximately 98 acres to restore sustainable function and structure to plant communities, reduce potential for stand-replacement wildfires and overall fire management costs. g and Fuels Treatment ( continued) None Known Project0 t1ie 4r- s9 4to- 0E9A. # OR- Project ongoing Joe Fmn T37S, RIOE, Sec. 24 & 25 T37S, RI 1.5E, Sec. 31 Bald Eagle ( Analysis Completed- I 200 acres treated in FY I None Analysis Completed Project tiers to EA # OR- 014- 94- 09. EA completed Wildlife Habitat Riparian Initiated Winter 2001 Fall 2004 Joe Foran Project delayed until the Spring 2004 Bald None Bald Eagle I Planned projects tier to the Promammatic Fire I Joe Foran Joe Foran Project initiated, 2- 3 year implementation FONSI - 12- 1 9- 99. 2000; Remainder Decision Record on 01 - 25- 2000 ,, Foran Joe Foran Analysis Completed Project tiers to EA # OR- 014- 94- 09) approved on 4- 29- 94. Initiated Winter 2001 Klamath Falls Resource Area, Winter 2003 Planning Update - Page 8 Wildlife forage/ habitat improvement 130 acres completed Remainder Spring 2004 Accomplished 1500 acres. Remainder Fall 2004. Steve Pehick- Underwood Joe Foran DNA completed ongoing 2- 3 year implementation Joe Foran .. " "" . 7 < .,.. - . . 7 - " b - . " < * - - ' 7 , 4 . , v ,-' w., ,. ' q"* -*?, . x*-.. s,... >,% VW? P ,*.- 7i*,- .*. x., < 8 SCHEDULE OF PROPOSED PROJECTS BUREAU OF LAND MANAGEMENT KLAMATH FALLS RESOURCE AREA * 2795 ANDERSON AVENUE, BLDG. # 25 KLAMATH FALLS, OR 97603 PHONE NUMBER: ( 541) 883- 69 MAP PROJECT TITLE & DESCRIPTION LOCATION I SPECIAL AREAS STATUS OF ANALYSIS COMPLETION CONTACT REF. # AFFECTED DATE Rangeland Health Standards Assessments - in progress I These assessments compare the monitoring information collected against the five Standards for Rangeland Health and propose management changes if current grazing use is not meeting the Standards, or not making significant improvement towards meeting them. Changes are implemented through the grazing decision or agreement process. z3I Re16 Allotment ( M893) I South Langell Valley I None Known I Assessment in progress I Summer 2004 I Dana Eckard M$\ 3 I KIamatL Forest Estates Allotment ( M862) 1 North of Bonanza -~ Yainax Allotment ( M861) I None Known I Assessment in progress I ~ ~ - 2 0 0 4 I Bill Lindsey North of Bonanza Map # 55 None Known ? G3 Haskins Allotment (# 0826) y&' Assessment in progress Masten Allotment ( M842) Map # 68 North of Bonanza Kellian Allotment (# 0834) Hungry Hollow Allotment (# 0830) Klamath Falls Resource Area, Winter 2003 Planning Update - Page 9 SUM 2004 North of Bonanza Adams Allotment (# 0800) Rangeland Health Standards Assessments - completed* Bill Lindsey None Known North of Bonanza North of Bonanza None Known East of Bonanza Bill Lindsey Assessment in progress None Known None Known * A total of 37 Rangeland Health Standards Assessments have been completed to date, 1 has been completed so far in FY 2004. Assessment in progress None Known None Known Assessment completed Summer 2004 Assessment in progress Assessment in progress Map North of Bonanza December 2003 # 48 Dana Eckard Summer 2004 Assessment in progress McCartie Allotment (# 0860) Dana Eckard Summer 2004 Summer 2004 Dana Eckard Summer 2004 Dana Eckard Dana Eckard Presentations/ Environmental Education Programs/ Tours ( Fiscal Year to Date) Fun With Fungi I 1 1/ 2/ 03 I Seven Mile Area Adults 25 I What Was Presented Overview of past and current outreach events; permit sales Wood River Wetland Field Trip Operation Indian Rocks ARPA Investigation 1 1 1/ 3/ 03 ( Central Washington University 1 Faculty and Students I 51 I Date 1 Group / Age # of People 1 01 1 5/ 03 10/ 28/ 03 Where Cultural Resource Management and the NEPA Process Archaeological Investigations in the Great Basin I Wildlife Management 1 12/ 16/ 03 1 OIT - " Expanding Horizons" I 8* Grade Students I 120 1 Ross Ragland Theater Wood River Wetland Coloring Books 1 1/ 3/ 03 1 1/ 4/ 03 Klarnath Falls Resource Area, Winter 2003 Planning Update - Page 10 Answer People/ Adults Oregon Institute of Technology Students I 1 1 11 9/ 03 Shasta Elementary School -- - S - 290 Fire Behavior 25 - 30 Central Washington University Central Washington University Elementary Students 30 12/ 20/ 03 Graduate Student Seminar Graduate Student Seminar 24 35 Klamth Community College Adults 8 EventIActivlty Date Location Contact( s) F 01 rarnclpanrs ( EmployeeslPublic*) IBald Eagle Conference I Februaryl3- IS I Oregon Institute of Technology I Steve Haynerl Kelly Hollums I l~ arthD ay I April I Jefferson Square Mall I Greg Reddell I Klamath Watershed conference February 24 - 26 Wilderness & Horse Packing Clinic** International Migratory Bird Day IMBD Pre- event Classes -- - IMBD Educator Workshop Oregon Institute of Technology May ( IMBD) April 24 IMBD Event National Free Fishing Day RAP Camp Klamath County Fair Klamath Falls Resource Area, Winter 2003 Planning Update - Page 11 Wedge WatkinslKelly Hollums April 16 - pp - - Sixth Grade Forestry Tour National Public Lands Day Oregon Archeology Celebration Klarnath County Fairgrounds Klamath Community College May 8 June June August Tonya PinckneyIScott Senter Steve Hayner, et al OSU- Klamath Co. Extension * Numbers of public participants for large events are estimated. ** BOLD WRITING indicates that project is funded with District Outreach dollars. September September September Veteran's Park To Be Announced Camp Esther Applegate Klamath County Fairgrounds Steve Hayner, et al Steve Hayner Scott Snedaker To Be Announced PinckneylSenter Clover Creek Educational Area To Be Announced To Be Announced ~ p Bill Johnson To Be Announced Michelle Durant Glama th Falls Resource Area Miscellaneo~ wP roject Loca ticms R6E RBE R7E RBE RBE RlOE RIIE R12E R13E R14E R14.6E R16E Klamath Falls Resource Area, Winter 2003 Planning Update - Page 12 N LEGEND R5E R6E R7E R8E RQE RIOE R l l E R12E R13E R14E R14.5E R15E Klarnath Falls Resource Area, Fall 2003 Planning Update - Page 13 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGE~ ENT Klarnath Falls Resource Area Office 2395 Parderson Avenue, Building a 5 Kfamth MIS. Oregan 97603 OF. FIGIAL, BUSI~ ESS PENALTY FOR PRIVATE USE, $ 300 Marita Kunkel Library Director Oregon Institute of Techolagy 3201 Cempus Dr Klamath Falls, OR 97601
-
208. [Image] Water quality monitoring : technical guide book
-
"Holistic planning for Lake Ewauna & the south entry to the City of Klamath Falls"
Citation -
SUMMARY To provide a basis for negotiations of a repayment contract with an irrigation district representing the water users of the Tule Lake Division of the Klamath Project, this report has been prepared. ...
Citation Citation
- Title:
- Report on payment capacity for Tule Lake irrigation district, Klamath Project
- Author:
- Best, R.R.
- Year:
- 1948, 2004
SUMMARY To provide a basis for negotiations of a repayment contract with an irrigation district representing the water users of the Tule Lake Division of the Klamath Project, this report has been prepared. It covers past, present, and anticipated future agricultural and economic conditions and substantiates the proposed district's capacity to repay construction costs for irrigation water as well as to meet operation and maintenance charges It has been prepared according to procedures and policies established pursuant to the Federal Reclamation laws (Act of June 17, 1902, 32 Stat. 388, and acts amendatory thereof and supplementary thereto.) In general, a representative farm budget method of analysis was employed to determine the payment capacity* Gross income of the land was based upon average per acre yields in the area and 1939-44 prices received. Prices of certain crops were adjusted further in accordance with long term outlook for these crops. From the gross income, all farm operating and retention expenses, including cultural and harvesting costs, taxes, insurance, depreciation and replacement, interest on investment, and a reasonable allowance for family living predicated upon the same base period (1939-44) have been subtracted to arrive at payment capacity. Individual consideration has been given to the block of land entered prior to 1948 (the major portion of the area), the lands of the Coppock Bay Area which are principally Class 2, and the undeveloped lands of the area just south of Malin, Oregon, Area C, Plate 1. The annual payment capacity of the irrigable lands entered prior to 1914-8, is determined to be approximately $50 per acre. The Class 2 lands of the Coppock Bay Area are shown to have a payment capacity of $21 per acre, as a result of slightly higher operating costs and probable lower yield or quality of certain crops. For the undeveloped area just south of Malin, Area C of Plate 1, the payment capacity is determined at $18 per acre after development to the extent expected under settlement and development plans currently being formulated The weighted average payment capacity for these areas is calculated to be $26.25 per acre. There is no need for a development period for the lands of the Tule Lake Division, except for the latter area as indicated above. Furthermore, after liberal allowance for farming costs and a reasonable family living, the resulting payment capacities appear to be well in excess of any annual installments likely to be considered necessary for repayment of the District's construction obligation and operation and maintenance charges.