Search

You searched for: Start Over Photos Remove constraint Photos Database Klamath Waters Library Remove constraint Database: Klamath Waters Library

Search Results

  • 2735
    KP-2041-R2 - Klamath Project. Lost River Diversion Channel. Control Structure and Railroad Bridge. Picture taken at the northwest corner showing base for the northwest wing wall. New piles have been ...
    Citation
  • 2736
    KP-2044-R2 - Klamath Project. Lost River Diversion Channel. Control Structure and Railroad Bridge. Picture is an experiment for action shots showing the blasting of the base of the old northwest wingwall. ...
    Citation
  • 2043. [Image] Mossing Operation
    2737
    KP-2045-R2 - Klamath Project. Mossing Operation. Two T-D6 cats pull a heavy chain in lateral to cut away weeds and moss. The cats work a see-saw operation with the 100 foot heavy chain, that is, one ...
    Citation
  • 2044. [Image] Farm of E. C. Lemler
    2746
    KP-2054-R2 - Klamath Project. Total of 220 acres; 35 acres of potatoes, 100 acres Hannchen Barley, 85 acres of clover. Lemler's development is the result of 13 years of farming. Picture shows the beautiful ...
    Citation
  • 2749
    KP-2057-R2 - Klamath Project. Total acreage, 84.2 acres; 25 acres onions, balance in potatoes. Picture shows one of a few onion crops in the Tule Lake area. This is the first attempt to raise onions ...
    Citation
  • 2750
    KP-2058-R2 - Klamath Project. 1946 Tule Lake Homestead Area. Looking straight north. James A Bell homestead near left; Alber N. Krouse homestead, center. Homesteads along center of picture from Krouse's ...
    Citation
  • 2752
    KP-2060-R2 - Klamath Project. Telephoto showing the results of the homesteaders' grain harvest. The hill of grain outside the elevators is Hannchen Barley. Lack of railroad cars for transportation ...
    Citation
  • 2754
    KP-2063-R2 - Klamath Project. Lost River Diversion Channel Control Structure and Railroad Bridge. Close-up of pier showing 3/4" dowels and prepared concrete face. While driving piling, the concrete ...
    Citation
  • 3560
    KP-2544-R2- Klamath Project - PUMPING PLANT 9, Tule Lake Sump 2. Looking north to plant intake. The high motor deck is required when Sump 2 is flooded in years of high runoff; December 26, 1959; Photo ...
    Citation
  • 3561
    KP-2545-R2-Klamath Project - PUMPING PLANT 9, Tule Lake Sump 2. View of pumping units taken from bridge deck. Units are 25 cfs capacity at 15 feet head; December 26, 1959; Photo by K.J. Greene
    Citation