Search

You searched for: Start Over Photos Remove constraint Photos Database Klamath Waters Library Remove constraint Database: Klamath Waters Library

Search Results

  • 1477
    KP-1135-R2 - Klamath Project; Concrete mixing plant of the Tru-Mix Concrete Company at Pumping Plant "E", showing aggregate bins, batching hopper, mixer and the pumpcrets machine used for the delivery ...
    Citation
  • 1478
    KP-1136-R2 - Klamath Project; General view looking toward the back end of the excavation for the sub-structure. The foundation is a tight medium weight clayish material that stands almost vertical in ...
    Citation
  • 1498
    KP-1156-R2 - Klamath Project; Concrete has been placed up to the pump floor. Burlap sacks over the concrete were kept damp for curing; November 6, 1945; Photo by C. O. Wamstad
    Citation
  • 1503
    KP-1161-R2 Klamath Project - Railroad Siphon - Klamath Straits Drain Outlet; The siphon consists of three 54" corrugated metal pipes which were jacked through the railroad embankment without interference ...
    Citation
  • 1506
    KP-1165-R2 Klamath Project. Power companies (sic) transformer pole toppled over, dropping the transformers into the mud. Dewatering pumps were drowned out. Plant pumps and meters set in place but not ...
    Citation
  • 1507
    KP-1166-R2 - Klamath Project. All construction work at the Plant stopped pending the re-installation of power to contractors' pumps, as a result of the loss of transformers when transformer pole toppled ...
    Citation
  • 1511
    KP-1167-R2 Klamath Project - Klamath Straits Drain Outlet; Flood irrigation of the lands is in progress. View shows effects of a wind storm on power line due the the poor stability of earth in which ...
    Citation
  • 1515
    KP-1171-R2 Klamath Project; Construction is complete. Pumping Unit #3 is installed ready for operation. Unit #2 is installed excepting the motor which was damaged during installation: See picture KP-1165-R2 ...
    Citation
  • 1519
    KP-1175-R2 Klamath Project; The outlet is to be used temporarily until such time a new structure is constructed. Note: Erosion of the dike on the left showing anticipated effect of use of the outlet ...
    Citation
  • 1523
    KP-1179-R2 Klamath Project - Tule Lake Division O&M; Spraying weeds with Sinox-General and diesel oil at the rate of 3 pints of Sinox-General and 10 gallons of diesel oil per 100 gallons of water; June ...
    Citation