1351. [Image] Southwest Sump Dikes
2179-R2 - Southwest Sump Dikes. Klamath Project, Oregon-California. Station 44 looking north. Unfinished back slope which was wetter material placed direct from toe drain to dragline 38-B. Top portion ...Citation -
1352. [Image] Photo taken on southwest corner of Lot #81, showing erosion from irrigation water spilling into drain and filling drain
CN-12-201-632NA Klamath Project - Oregon-California. Low area of lease shows when secondary drains were filled; April 1976; USBR photo by J. W. LeggCitation -
1353. [Image] Lease Lot No. 6B, Area “K”
CN-12-201-634NA Klamath Project - Oregon-California; Photo shows no quackgrass showing above water after mowing with aquatic mower on July 18 and 19, 1976; August 23, 1976; USBR photo by J. W. LeggCitation -
1354. [Image] Lease Lot No. 6A, Area “K”
CN-12-201-635NA Klamath Project - Oregon-California. Photo shows quackgrass standing above water. Area was not mowed, consequently indications are of poor quackgrass control in areas where quackgrass ...Citation -
1355. [Image] Lease Lot No. 10A, area "K"
CN-12-201-636NA Klamath Project - Oregon-California. Photo shows no quackgrass above water after mowing with aquatic mower mounted on an air boat; August 23, 1976; USBR photo by J. W. LeggCitation -
CN-12-200-38A Klamath Project, Oregon-California. Photo shows old superstructure as designed for housing three indoor motor units and pumps nearly 30 years ago; June 20, 1967; Bureau of Reclamation ...
Citation -
1357. [Image] "After" Rehabilitation of Pumping Plant "C"
CN-12-200-40A Klamath Project, Oregon-California. Photo shows new pumping plant, consiting (sic) of one outdoor-type unit on remodeled superstructure. Parts of remodeling job not visible included lowering ...Citation -
1358. [Image] Tule Lake Lease Unit No. 24, Sump 3
CN-12-200-42A Klamath Project, Oregon-California. Photo shows furrow-irrigated potatoes damaged by frost early morning of August 7, 1969; August 8, 1969; Bureau of Reclamation photo by J.W.LeggCitation -
1359. [Image] Clear Lake Spillway Rehabilitation - Specs. 200C-889 - Roy D. Garren Corporation, Contractor
P-12-200-3043NA Klamath Project - Oregon-California. View of right wall area. Cut-off wall is on left side of photo. Note that forms are in place; June 1974; USBR photo by D. W. SteinCitation -
1360. [Image] Work on Big Fill, Div. 3, Main Canal
August 15, 1906; Originally #34 of a series of eighty seven photos; Photo by D.W.M. (may be initials of the Klamath Project engineer D.W. Murphy)Citation