Search Results
-
3771. [Image] Link River Dam
KP-2182-R2 - Klamath Project. Link River Dam. Close-up view of the agglomerate foundation material under the apron in the river outlet section, east, downstream side of river gates; October 28, 1952; Bureau ...Citation -
3772. [Image] Link River Dam
KP-2186-R2 - Klamath Project. Link River Dam. View of river gate section taken from southwest side of excavated basin. Construction of concrete stilling basin by The California-Oregon Power Company; October ...Citation -
KP-2187-R2 - Klamath Project. General view looking upstream into basin. Link River Dam; November 26, 1952; Bureau of Reclamation Photo by C. O. Wamstad
Citation -
3774. [Image] Link River Dam
KP-2189-R2 - Link River Dam. Klamath Project. General view of downstream face of Dam and River Outlet Stilling Basin; November 26, 1952; Bureau of Reclamation Photo by C. O. WamstadCitation -
3775. [Image] Lower Cost Canal Lining
KP-2190-R2--Lower Cost Canal Lining. Klamath Project. M-2-a Lateral. Flat-iron roller which has five 18" X 16" airplane tires. Used in compacting earth lining; April 13, 1953; Bureau of Reclamation Photo ...Citation -
3776. [Image] Lower Cost Canal Lining, Klamath Project
KP-2193-R2--Lower Cost Canal Lining, Klamath Project. M-2-a Lateral, Station 150+00. General view of grader and rollers constructing compacted banks; April 13, 1953; Bureau of Reclamation Photo by C. O. ...Citation -
3777. [Image] Lower Cost Canal Lining
KP-2195-R2--Lower Cost Canal Lining. Klamath Project. M-2-a Lateral. Compacted earth lining. D-8 cat with dozer pulling in last lift for compacted bank; April 13, 1953; Bureau of Reclamation Photo by C. ...Citation -
3778. [Image] Lower Cost Canal Lining, Klamath Project
KP-2197-R2--Lower Cost Canal Lining, Klamath Project. M-2-a Lateral. Compacted earth lining. Looking downstream from Sta. 143+00. Bottom section after winter's weathering; March 29, 1953; Bureau of Reclamation ...Citation -
3779. [Image] Lower Cost Canal Lining
KP-2199-R2--Lower Cost Canal Lining. Klamath Project. M-2-a-1 Lateral. End of 30-inch over-excavated section for compacted earth lining showing also, undisturbed ditch; April 13, 1953; Bureau of Reclamation ...Citation -
3780. [Image] Lower Cost Canal Lining, Klamath Project
KP-2192-R2--Lower Cost Canal Lining, Klamath Project. M-2-a Lateral, Station 150+00. General view of grader and rollers constructing compacted banks. Next-to-last lift; April 13, 1953; Bureau of Reclamation ...Citation