3101. [Image] ENTERPRISE POWER PLANT
KP-2390-R2 - Klamath Project--ENTERPRISE POWER PLANT. Outlet showing flow through 4ft. x 6ft. hole in power plant structure and through bypass. Flow is about 600 cfs and is smooth downstream; June 13, ...Citation -
KP-2391-R2 - Klamath Project--ENTERPRISE POWER PLANT. Concrete lining is about 3" thick. Reinforcement shows considerable corrosion; June 13, 1957; Photo by K. J. Greene
Citation -
3103. [Image] ENTERPRISE POWER PLANT - Release of approximately 600 cfs through power house structure and bypass
KP-2393-R2 - Klamath Project--ENTERPRISE POWER PLANT. Turbine not operating; June 13, 1957; Photo by K. J. GreeneCitation -
3104. [Image] CLEAR LAKE RESERVOIR - Underwater soil sampling raft
KP-2394-R2 - Klamath Project--CLEAR LAKE RESERVOIR. Samples are obtained by driving 3" pipe, shown in center of raft, into lake bottom and inserting soil sampling tube inside this pipe; June 11, 1957; ...Citation -
KP-2395-R2 - Klamath Project--FROG POND AREA. About 1100' south of N-12 lateral; June 16, 1957; Photo by K. J. Greene
Citation -
KP-2397-R2 - Klamath Project--TULE LAKE SUMP 2. Structural and foundation failure due to lack of structure to resist earth pressure; June 10, 1957; Photo by K. J. Greene
Citation -
3107. [Image] CLEAR LAKE - Underwater soil sampling raft
KP-2401-R2 - CLEAR LAKE - Klamath Project. Raft is propelled by one 15 H.P. and one 10 H.P. outboard motor; October 16, 1957; Photo by K. J. GreeneCitation -
3108. [Image] CLEAR LAKE - Underwater soil sampling procedure
KP-2403-R2 - CLEAR LAKE - Klamath Project. Lifting and unscrewing sections of Vehmeir tube; October 16, 1957; Photo by K. J. GreeneCitation -
3109. [Image] CLEAR LAKE - Underwater soil sampling procedure
KP-2405-R2 - CLEAR LAKE - Klamath Project. Sample is shown lying ahead of sampling tube. Selected samples are stored in carton shown; October 16, 1957; Photo by K. J. GreeneCitation -
3110. [Image] CLEAR LAKE - Underwater soil sampling procedure
KP-2406-R2 - CLEAR LAKE - Klamath Project. Dave Bunger is sighting two buoys with a sextant. At least 3 located points are used for a fix on the map; October 16, 1957; Photo by K. J. GreeneCitation