Search
You searched for:
Start Over
Photos
Remove constraint Photos
Material Types
Image
Remove constraint Material Types: Image
« Previous | 21,951 - 21,960 of 27,490 | Next »
Search Results
-
21951. [Image] Lost River Diversion Channel Enlargement
KP-5 - Klamath Project. Looking East at C-Canal Flume Crossing, (Station 78) dismantled preparatory to constructing new piers, State Highway bridge in background, 1-B drain on right of Channel. Section ...Citation -
21952. [Image] Lost River Diversion Channel Enlargement
KP-8 - Klamath Project. Lost River Diversion Channel Enlargement. Miller Hill Pumping Station 217 of Lost River Diversion Channel looking East. C-4-e lateral in foreground; October 20, 1949; Photo ...Citation -
21953. [Image] Lost River Diversion Channel Enlargement
KP-12 - Klamath Project. Lost River Diversion Channel, Klamath River End. Compacted embankment of enlarged section has been constructed, but channel excavation has not yet started. Farm bridge in foreground ...Citation -
21954. [Image] Scene of an accident of a weed-burning truck
Pictures taken at time of fatal accident when weed-burning truck rolled over into the canal pinning Thelmar O. Biddie under truck in drain ditch filled with 2 feet of water. This fatal accident occurred ...Citation -
21955. [Image] Scene of an accident of a weed-burning truck
Pictures taken at time of fatal accident when weed-burning truck rolled over into the canal pinning Thelmar O. Biddie under truck in drain ditch filled with 2 feet of water. This fatal accident occurred ...Citation -
KP-1284-R2 - Klamath Project - Lost River below Boundary Dam Site. Looking downstream toward 32/15. Shadow on left side of picture due to high ridge on west side of river. Time 2:30 P. M.; December ...
Citation -
KP-1329-R2 - Klamath Project. Region II. Mrs. Eleanor J. Bolesta, the only woman winner of a farm in the recent drawing for homesteads, located near Merrill on the Klamath Project. Mrs. Bolesta, despite ...
Citation -
KP-1159-R2 - Klamath Project. Note the steel cover plates in the place of flap gates in a position provided for future installation of a third unit. Fencing about the plant, embankment, and painting of ...
Citation -
21959. [Image] Pumping Plant F - Fabricated float stop
P12-200-2855NA Pumping Plant F., Klamath Project, Oregon-California. Fabricated float stop that was installed over lower end of float well pipe in Unit 1 of pumping plant. Inside dimensions of clamp ...Citation -
21960. [Image] TULE LAKE SUMP 3, Secondary Drain 31, Specifications DC-5621
KP-2633-R2-Klamath Project -- TULE LAKE SUMP 3, Secondary Drain 31, Specifications DC-5621. Looking west from Station 70, N-12-e lateral. Spoil pile will be smoothed down later; October 30, 1961; Photo ...Citation