« Previous | 11 - 19 of 19 | Next »
Search Results
-
11. [Image] Gerber Dam
KP-2133-R2 - Klamath Project. Gerber Dam. Upstream area of center leakage. Should have been more concrete repair before application of Neoprene; August 7, 1952; Photo by A. L. KramerCitation -
12. [Image] Gerber Dam - leaks from construction joints
KP-2215-R2 - Klamath Project, Gerber Dam. Downstream face of spillway showing leaks from construction joints and water flowing along downstream face of dam. California Projects; July 14, 1953; Photo by ...Citation -
P-12-200-2979NA Klamath Project - Oregon-California. Jobsite on April 20, 1974, showing area to be repaired on face of dam. Note the wet areas under the steel mat caused by leakage through dam; April ...
Citation -
14. [Image] Sealing, Repair and Modification of Gerber Dam - Specs. 200C-888 - Dante Engineers & Contractors, Contractor
P-12-200-3014NA Klamath Project - Oregon-California. Dowel holes on repair area of Gerber Dam. Note the top two holes are showing internal leakage; April 14, 1974; USBR photo by J. A. RenningCitation -
15. [Image] Sealing, Repair and Modification of Gerber Dam - Specs. 200C-888 - Dante Engineers & Contractors, Contractor
P-12-200-3019NA Klamath Project - Oregon-California. Repair area on face of dam showing form work and steel. Note dark areas from leakage of water through dam; April 20, 1974; USBR photo by J. A. Ren...Citation -
16. [Image] Gerber Dam, showing four leaks
KP-2214-R2 - Klamath Project, Gerber Dam. Downstream face showing remaining four leaks after neoprene repairs to joints on upstream face. Arrow indicates approximate location of reported 5th leak. Flow ...Citation -
P12-201-4304 NA Klamath Project, OR-CA. Snall (sic) leak developing on west bank about midway and ±6' down from excavation surface at Plant E; December 1976; USBR photo by D. J. Kline
Citation -
P12-201-4310 NA Klamath Project, OR-CA. Below broken ice is inlet to 48" CMP which was flooded by earthen dam breaking, causing slide gate on inlet to Center Canal flume to backseat and leak; January ...
Citation -
19. [Image] Clear Lake Spillway Rehabilitation - Specs. 200C-889 Roy D. Garren Corporation, Contractor
CN-201-466NA Klamath Project - Oregon-California; View shows completed left wall. Stain on concrete caused by heavy jetting of backfill material behind wall. The water ran out of the weepholes; June ...Citation