Search
You searched for:
Start Over
Photos
Remove constraint Photos
Subject
Tule Lake Region (California)
Remove constraint Subject: Tule Lake Region (California)
« Previous | 321 - 330 of 428 | Next »
Search Results
-
P12-200-2649 - Klamath Project, California - TULE LAKE SUMP 3, N-13 Lateral Specifications DC-5686. View looking west from N-Canal bank. Bottom lining, south lining and bank are completed. Lining on north ...
Citation -
P12-200-2651 - Klamath Project, California - TULE LAKE SUMP 3, N-12-d Lateral farm turnout, Specifications DC-5621. View looking west to farm ditch leading from turnout at Station 18+70. Farm ditch is ...
Citation -
P12-200-2653 - Klamath Project, California - TULE LAKE SUMP 3, N-12-e Lateral, Specifications DC-5686. View looking east to 42-inch diameter flume over 101-B Drain. Large amount of return flow from secondary ...
Citation -
324. [Image] TULE LAKE SUMP 3, Specs. DC-5686
P12-200-2656 - Klamath Project, California - TULE LAKE SUMP 3, Specs. DC-5686. N-14 Lateral, Sta. 57. Hancock scraper and John Deere tractor placing lining material obtained from secondary drain; June ...Citation -
325. [Image] TULE LAKE SUMP 3, Spec. DC-5686
P12-200-2657 - Klamath Project, California - TULE LAKE SUMP 3, Spec. DC-5686. N-14 Lateral, Sta. 57, D-8 Cat pulling 4x4 LeTourneau sheepsfoot roller compacting side lining; June 2, 1962; Photo by K.J. ...Citation -
326. [Image] TULE LAKE SUMP 3, Spec. DC-5686
P12-200-2658 - Klamath Project, California - TULE LAKE SUMP 3, Spec. DC-5686. N-12-a Lateral, Sta. 52. No. 12 Cat motor patrol finishing inside trim of lateral; June 2, 1962; Photo by K.J. GreeneCitation -
327. [Image] TULE LAKE SUMP 3, Spec. DC-5621
P12-200-2659 - Klamath Project, California - TULE LAKE SUMP 3, Spec. DC-5621. N-12-B Lateral, Sta. 60. LeTourneau Model D pull scraper placing lining material on existing bank. This is mixed with bank ...Citation -
328. [Image] TULE LAKE SUMP 3, Spec. DC-5621
P12-200-2660 - Klamath Project, California - TULE LAKE SUMP 3, Spec. DC-5621. N-12-b Sta. 58. D-8 dozer pulling 4x4 LeTourneau sheepsfoot roller and spring tooth harrow compacting lining; May 31, 1962; ...Citation -
329. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2947NA Klamath Project - Oregon-California. View alongside of trencher showing horizontal alignment staffs. The operator sighted down the poles and was able to obtain very good alignment; December ...Citation -
330. [Image] Closed Drain Construction, Tule Lake Area, Sump 3 - Specs. 200C-910 - Patterson Construction Company, Contractor
P-12-200-3062NA Klamath Project - Oregon-California. View of Hoes Trencher with hopper, placing 4" plastic pipe on Line #11-1. Cinders are dumped onto conveyor where they are carried to hopper and placed ...Citation