Search

You searched for: Start Over Photos Remove constraint Photos Subject Tule Lake Region (California) Remove constraint Subject: Tule Lake Region (California)

Search Results

  • 3588
    KP-2572-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5307, R-Canal. John Deere tractor, Model A, pulling a 10-ton pneumatic roller to compact canal lining, Station 29+50, R-Canal; ...
    Citation
  • 3639
    KP-2573-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5307, R-Canal. 4-inch diameter aluminum pipe sprinkler system being used to sprinkle borrow areas adjacent to R-Canal, Station ...
    Citation
  • 3640
    KP-2574-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5307, R-Canal. Gasoline engine-driven pump supplies water for sprinkler system; September 30, 1960; Photo by John A. Renning
    Citation
  • 3644
    KP-2578-R2-Klamath Project - TULE LAKE DIVISION, SUMP 3, Specifications DC-5389, Secondary Drain No. 4. View of Hancock elevating scrapers excavating select material from Secondary Drain No. 4 for use ...
    Citation
  • 3645
    KP-2579-R2-Klamath Project - TULE LAKE DIVISION, SUMP 3, Specifications DC-5389, N-1 Lateral. Hancock elevating scraper placing select lining material at Station 84+00; January 26, 1961; Photo by Sam C. ...
    Citation
  • 3646
    KP-2580-R2-Klamath Project - TULE LAKE DIVISION, SUMP 3, Specifications DC-5389, N-1 Lateral. 48" LaTourneau roller compacting selected earth lining near Station 82+00; January 26, 1961; Photo by Sam ...
    Citation
  • 3647
    KP-2581-R2-Klamath Project - TULE LAKE DIVISION, SUMP 2, Specifications DC-5248, Q-Canal. Q-Canal headworks showing gate lifts installed and inlet channel completed; January 17, 1961; Photo by John A. ...
    Citation
  • 3648
    KP-2582-R2-Klamath Project - TULE LAKE DIVISION, SUMP 2, Specifications DC-5248, Q-Canal. Completed section of Q-Canal filled with water, looking upstream from Station 34+00; January 17, 1961; Photo by ...
    Citation
  • 3655
    KP-2583-R2-Klamath Project - TULE LAKE DIVISION, SUMP 2, Specifications DC-5248, Q-Canal. Looking upstream from Sta. 58+00 of Q-Canal. Bulkhead planks in check at Sta. 57+60 to hold water for ponding test; ...
    Citation
  • 3657
    KP-2585-R2-Klamath Project - TULE LAKE DIVISION, SUMP 2, Specifications DC-5307, R-Canal. Looking downstream from Station 37+07 of the R-Canal. Water flowing at the check at Station 37+36; January 18, ...
    Citation