  • 3958
    P12-200-2946NA Klamath Project - Oregon-California. View of Laser Beam Receiving Unit mounted on trencher. Note that the control panel for receiver unit is mounted to the left of controls for trencher; ...
    Citation
  • 2611
    KP-1974 - Klamath Project. Tule Lake Sump Dikes. B-Dike. Picture taken from top of Pumping Plant "C". Looking east. Picture shows dike, sump, 101-A Drain and the berm on North side of dike; June 29, 1950; ...
    Citation
  • 2612
    KP-1975- Klamath Project. Tule Lake Sump Dikes. Looking south from County Road Bridge. Picture shows N-Canal and area west of canal bank including 101-A-2-a Drain and Borrow Strip; June 15, 1950; Photo ...
    Citation
  • 2620
    KP-1983-R2 - Klamath Project. Tule Lake Sump Dikes. Looking south. Picture shows N-Canal, Great Northern Railroad and borrow area on both sides of railroad; June 29, 1950; Photo by Andrew M. Bergloff...
    Citation
  • 3560
    KP-2544-R2- Klamath Project - PUMPING PLANT 9, Tule Lake Sump 2. Looking north to plant intake. The high motor deck is required when Sump 2 is flooded in years of high runoff; December 26, 1959; Photo ...
    Citation
  • 3561
    KP-2545-R2-Klamath Project - PUMPING PLANT 9, Tule Lake Sump 2. View of pumping units taken from bridge deck. Units are 25 cfs capacity at 15 feet head; December 26, 1959; Photo by K.J. Greene
    Citation
  • 3562
    KP-2546-R2-Klamath Project - PUMPING PLANT 9, Tule Lake Sump 2. View of motor deck. Motors are 60 H.P. Deck can be removed to permit removal of pumping units with mobile crane. Mr. Hunsicker of Mechanical ...
    Citation
  • 3563
    KP-2547-R2-Klamath Project - PUMPING PLANT 9, Tule Lake Sump 2. View looking south, showing 30" diameter discharge lines and walkway. Walkway provides easy access from dike for plant operation and is necessary ...
    Citation
  • 3570
    KP-2554-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248 - Q-Canal. TD-18 Tractor and 4'x4' dual drum sheepsfoot roller compacting canal lining, bottom of Q-Canal, Station 38+00; ...
    Citation
  • 3571
    KP-2555-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248, Q-1 Lateral. 10 cubic yard scraper and TD-14 tractor placing lining in left bank lateral, Station 1+00; July 29, 1960; ...
    Citation