    P12-200-2720 - Klamath Project - Tule Lake Sump 2 - Q-1 Lateral, Station 13. View of left bank and farm turnout constructed two years ago. Note extent of exposure of cut stake hubs which at the time of ...
    Citation
  • 3426
    P12-200-2721 - Klamath Project - TULE LAKE SUMP 2 - Staff Gage "A", 102-D Drain, Station 40+20. View of one of the nineteen staff gages which were installed for drainage investigations; May 3, 1963; Photo ...
    Citation
  • 3524
    KP-2511-R2-Klamath Project -- Tule Lake Sump 2, Pumping Plant 9. Tule Lake Irrigation District removes old structure at pumping plant site. This structure was floated on oil barrels and end was anchored ...
    Citation
  • 3527
    KP-2514-R2-Klamath Project -- SUMP 3 - TULE LAKE. Barley on lot 23, W1/2 of SW1/4 of Sec. 18, T47N, R5E, where experimental tile drains were installed in 1958, showing growth in southwest corner; July ...
    Citation
  • 3542
    KP-2526-R2-Klamath Project -- TULE LAKE SUMP 2, PUMPING PLANT 9. View looking north showing driving of sheet piling for structure. Sheet piling in background was driven by contractor to protect excavation; ...
    Citation
  • 3546
    KP-2530-R2 -Klamath Project -- TULE LAKE - SUMP 2, PUMPING PLANT 9. View looking north. Sheet piling, round piling and caps, and trashrack beam are in place. Contractor is preparing to excavate interior; ...
    Citation
  • 3558
    KP-2542-R2 - Klamath Project - PUMPING PLANT 9, TULE LAKE SUMP 2. View of pumping unit and plant. Pumping unit has been assembled and is ready for installation; December 9, 1959; Photo by K.J. Greene
    Citation
  • 3269
    KP-2385-R2 - Klamath Project--TULE LAKE DIVISION. About 1500' south of pumping plant experimental drain, showing material in middle of drain which was pushed up evidently by pressure of adjacent banks. ...
    Citation
  • 3270
    KP-2386-R2 - Klamath Project--TULE LAKE DIVISION. Experimental drain about 300' south of pumping plant, looking N.W. to dragline which has been excavating material pushed up in bottom of drain. Bank has ...
    Citation
  • 3272
    KP-2388-R2 - Klamath Project--TULE LAKE DIVISION. Experimental drain about 300' south of pumping plant. Looking south to new bank subsidence in foreground and showing bank subsidence in backgroud which ...
    Citation