Search
You searched for:
Start Over
History
Remove constraint History
Subject
Trenches
Remove constraint Subject: Trenches
Subject
Tule Lake Region (California)
Remove constraint Subject: Tule Lake Region (California)
Subject
Tule Lake Sump (California)
Remove constraint Subject: Tule Lake Sump (California)
« Previous | 1 - 10 of 37 | Next »
Search Results
-
P12-200-2708 - Klamath Project - TULE LAKE SUMP 3 - Contract Unit 1 - Specs. DC-5389 - N-1 Lateral. North face of trench at Station 102+70; February 7, 1963; Photo by C. D. Lawrence
Citation -
P12-200-2709 - Klamath Project - TULE LAKE SUMP 3 - Contract Unit 1 - Specs. DC-5389 - N-1 Lateral. South face of trench at Station 105+00; February 7, 1963; Photo by C. D. Lawrence
Citation -
P12-200-2907NA Klamath Project - Oregon-California. View of pipe laying operation. Note relationship of trenching machine to dump truck; December 1972; Bureau of Reclamation photo by D. W. Stein
Citation -
P12-200-2908NA Klamath Project - Oregon-California. View of Hoes Gigant trencher operating in cold weather; December 1972; Bureau of Reclamation photo by D. W. Stein
Citation -
P12-200-2909NA Klamath Project - Oregon-California. View of contractor's equipment. Cinders are fed into conveyor belt from dump truck and then into the hopper unit mounted on the back of the trenching ...
Citation -
P12-200-2910NA Klamath Project - Oregon-California. View of trencher starting to excavate a drain line. The hopper and digging unit are dropped into place at the outlet of the proposed line. Then, the ...
Citation -
P12-200-2911NA Klamath Project - Oregon-California. It bacame [sic] necessary to scrape the snow away from the front of the trenching machine because of its high flotation. The maching was unable to ...
Citation -
P12-200-2915NA Klamath Project - Oregon-California. View of operator's control panel mounted on Hoes Gigant trenching machine; December 1972; Bureau of Reclamation photo by D. W. Stein
Citation -
P12-200-2916NA Klamath Project - Oregon-California. View of trenching equipment in operation; December 1972; Bureau of Reclamation photo by D. W. Stein
Citation -
10. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2917NA Klamath Project - Oregon-California. View of trenching equipment. The trencher is almost at the end of a newly installed closed drain line. Note the workman threading a short section of ...Citation