P12-201-4283 NA Klamath Project Oregon-California. Pumping Plant EE excavation with one-half soldier piling driven to depth and the other half set in place only; December 14, 1976; USBR photo by D. J. ...
Citation -
P12-201-4294 NA Klamath Project OR-CA. Pumping Plant EE piling for Bent No. 1 background, and Bent No. 2 in place. Required extra piling foreground, left, as piling next to it didn't meet specs. design. ...
Citation -
P-12-201-4295 NA Klamath Project, OR-CA. Excavation of Pumping Plant EE site, using dragline. A 3500 Manitowoc crane with 1-yard bucket, was in use. Material encountered was same as indicated in Drawing ...
Citation -
P-12-201-4298 NA Klamath Project, OR-CA. Excavation of Pumping Plant EE crane platform. Piling stockpiled in background; December 1976; USBR photo by D. J. Kline
Citation -
P-12-201-4299 NA Klamath Project, OR-CA. Pumping Plant EE excavation. First half completed to ±50 elevation; December 1976; USBR photo by D.J. Kline
Citation -
P-12-201-4300 NA Klamath Project, OR-CA. Completed dike between P Plant EE excavation and Kl. Str. Drain. View, looking east. of existing Plant E and excavation for Pumping Plant EE; December 1976; ...
Citation -
P-12-201-4302 NA Klamath Project, OR-CA. Crane moving to second landing to complete second half of Plant EE excavation. View Looking east; December 1976; USBR photo by D. J. Kline
Citation -
P-12-201-4303 NA Klamath Project, OR-CA. Soldier piling (1'x1') driven to contractor's plan to a depth of ±9', to be used in conjunction with wood lagging to protect worker and work inside Plant EE work ...
Citation -
P12-201-4304 NA Klamath Project, OR-CA. Snall (sic) leak developing on west bank about midway and ±6' down from excavation surface at Plant E; December 1976; USBR photo by D. J. Kline
Citation -
P12-201-4306 NA Klamath Project, OR-CA. Nearly completed Plant EE excavation to depth elev. ±50. Water in excavation is due to the power being off to east side wells, for approximately 30 hours; December ...
Citation