Search
You searched for:
Start Over
Photos
Remove constraint Photos
Subject
Pumping stations -- Design and construction
Remove constraint Subject: Pumping stations -- Design and construction
« Previous | 151 - 160 of 256 | Next »
Search Results
-
P12-201-4557NA Klamath Project, OR-CA. Pumping Plant E Bridge. Bridge section is in position over abutments and is jacked down onto bearing pads in stages; April 1978; USBR photo by D.J. Kline
Citation -
P12-201-4558NA Klamath Project, OR-CA. Pumping Plant E Bridge. Completed and ready for travel; May 1978; USBR photo by D.J. Kline
Citation -
P12-201-4570NA Klamath Project, OR-CA. Pumping Plant EE. Bucyrus Erie 22-B dragline excavating drain inlet to Plant EE. Note inlet was flooded prior to connecting drain to pumping plant; April 11, ...
Citation -
P12-201-4571NA Klamath Project, OR-CA. Plant EE. Muck from inlet excavation was double and triple hauled from inlet to just south of flume bridge, then over flume to spoils pile south of flume. It was ...
Citation -
P12-201-4572NA Klamath Project, OR-CA. Plant E. Outlet east side bridge footing forms. Note back of footing was extended to allow for out of specifications piling. The extra concrete and steel was at ...
Citation -
P12-201-4573NA Klamath Project, OR-CA. Pumping Plant EE. View of combined inlet to Pumping Plants E and EE. More work remains to be done on rounded point between the two transitions; April 17, 1978; ...
Citation -
P12-201-4574NA Klamath Project, OR-CA. Pumping Plant EE. Drain excavation outlet side using Bycyrus (sic) Erie 22B dragline with 1 yd. bucket. Note stilling well and flow pipes to stilling well; April ...
Citation -
P12-201-4580NA Klamath Project, OR-CA. Pumping Plant EE. Unit #1 is activated with Unit #3 and #2 running; June 1978; USBR photo by D.J. Kline
Citation -
P12-201-4581NA Klamath Project, OR-CA. Pumping Plant EE. All 3 pumping units running normally; June 1978; USBR photo by D.J. Kline
Citation -
160. [Image] Upstream face and inlet transition to weir, just below outlet to tunnel from Pumping Plant "D"
KP-1928 - Klamath Project. Set-up was made for testing of Worthington Units 4 and 5 of Pumping Plant "D"; March 16, 1950; Photo by Mark D. Taylor, Jr.Citation