    P12-200-2719 - Klamath Project - KLAMATH PROJECT EXTENSIONS - Klamath Basin Improvement District Contract - Poe Valley Pumping Plant. View looking north showing outlet structure in "F" Canal; April 5, ...
    Citation
  • 42. [Image] TULE LAKE SUMP 2
    3280
    KP-2396-R2 - Klamath Project--TULE LAKE SUMP 2. Drainage pumping plant constructed by Lessees for pumping from leases to Sump 1. Structural and foundation failure due to lack of structure to resist earth ...
    Citation
  • 3295
    KP-2408-R2 - TULELAKE IRRIGATION DISTRICT - Klamath Project. Small pumping plant which pumps water from No. 45 drain into J-11 lateral. This type is called a "box pump" locally. The vertical column is ...
    Citation
  • 2300
    KP-1802-R2. The ditch connecting the two sloughs under the outlet pipes shows as a disconnected channel. Plug between plant and the Lost River Diversion Channel not yet removed; May 27, 1949; Photo by ...
    Citation
  • 3861
    P12-200-2851NA Pumping Plant F, Klamath Project, Oregon-California. Float well in pump chamber of Unit 1 (left) was measured for installation of float stop; February 16, 1966; Bureau of Reclamation ...
    Citation
  • 3862
    P12-200-2852NA Pumping Plant F, Klamath Project, Oregon-California. Divers entering Unit 1 from access hole in trashrack deck to determine condition of float well pipe and take measurements for fabrication ...
    Citation
  • 3863
    P12-200-2853NA Pumping Plant F, Klamath Project, Oregon-California. Visibility in pump chamber was zero even with light shown. Left to right: B. H. Carter, T. E. Morris, T. J. Spicher, J. L. Andrews; ...
    Citation
  • 3562
    KP-2546-R2-Klamath Project - PUMPING PLANT 9, Tule Lake Sump 2. View of motor deck. Motors are 60 H.P. Deck can be removed to permit removal of pumping units with mobile crane. Mr. Hunsicker of Mechanical ...
    Citation
  • 3563
    KP-2547-R2-Klamath Project - PUMPING PLANT 9, Tule Lake Sump 2. View looking south, showing 30" diameter discharge lines and walkway. Walkway provides easy access from dike for plant operation and is necessary ...
    Citation
  • 3658
    KP-2586-R2-Klamath Project - TULE LAKE DIVISION, SUMP 2, Specifications DC-5358, Pumping Plant "Y". Completed Pumping Plant "Y" showing gravel surfacing and soil sterilant at toe of embankment in background; ...
    Citation