Search
You searched for:
Start Over
Photos
Remove constraint Photos
Subject
Pumping stations
Remove constraint Subject: Pumping stations
« Previous | 41 - 50 of 62 | Next »
Search Results
-
41. [Image] KLAMATH PROJECT EXTENSIONS - Klamath Basin Improvement District Contract - Poe Valley Pumping Plant
P12-200-2719 - Klamath Project - KLAMATH PROJECT EXTENSIONS - Klamath Basin Improvement District Contract - Poe Valley Pumping Plant. View looking north showing outlet structure in "F" Canal; April 5, ...Citation -
42. [Image] TULE LAKE SUMP 2
KP-2396-R2 - Klamath Project--TULE LAKE SUMP 2. Drainage pumping plant constructed by Lessees for pumping from leases to Sump 1. Structural and foundation failure due to lack of structure to resist earth ...Citation -
KP-2408-R2 - TULELAKE IRRIGATION DISTRICT - Klamath Project. Small pumping plant which pumps water from No. 45 drain into J-11 lateral. This type is called a "box pump" locally. The vertical column is ...
Citation -
44. [Image] Aerial view of Miller Hill Plant
KP-1802-R2. The ditch connecting the two sloughs under the outlet pipes shows as a disconnected channel. Plug between plant and the Lost River Diversion Channel not yet removed; May 27, 1949; Photo by ...Citation -
P12-200-2851NA Pumping Plant F, Klamath Project, Oregon-California. Float well in pump chamber of Unit 1 (left) was measured for installation of float stop; February 16, 1966; Bureau of Reclamation ...
Citation -
P12-200-2852NA Pumping Plant F, Klamath Project, Oregon-California. Divers entering Unit 1 from access hole in trashrack deck to determine condition of float well pipe and take measurements for fabrication ...
Citation -
P12-200-2853NA Pumping Plant F, Klamath Project, Oregon-California. Visibility in pump chamber was zero even with light shown. Left to right: B. H. Carter, T. E. Morris, T. J. Spicher, J. L. Andrews; ...
Citation -
48. [Image] PUMPING PLANT 9, Tule Lake Sump 2
KP-2546-R2-Klamath Project - PUMPING PLANT 9, Tule Lake Sump 2. View of motor deck. Motors are 60 H.P. Deck can be removed to permit removal of pumping units with mobile crane. Mr. Hunsicker of Mechanical ...Citation -
49. [Image] PUMPING PLANT 9, Tule Lake Sump 2
KP-2547-R2-Klamath Project - PUMPING PLANT 9, Tule Lake Sump 2. View looking south, showing 30" diameter discharge lines and walkway. Walkway provides easy access from dike for plant operation and is necessary ...Citation -
KP-2586-R2-Klamath Project - TULE LAKE DIVISION, SUMP 2, Specifications DC-5358, Pumping Plant "Y". Completed Pumping Plant "Y" showing gravel surfacing and soil sterilant at toe of embankment in background; ...
Citation