Search
You searched for:
Start Over
Photos
Remove constraint Photos
Subject
Pumping Plant EE (Oregon)
Remove constraint Subject: Pumping Plant EE (Oregon)
« Previous | 41 - 50 of 74 | Next »
Search Results
-
P12-201-4344 NA Klamath Project, OR-CA. Pumping Plant EE - View looking northeast at pild (sic) driving trestle after removal of Bent #4. Note side and end rails, which have been reinforced to allow use ...
Citation -
P12-201-4345 NA Klamath Project, OR-CA. Pumping Plant EE - View of Plant EE looking northeast. Bottom steel mat is in place and steel placers in process of tying top mat; March 18, 1977; USBR photo by ...
Citation -
P12-201-4347 NA Klamath Project, OR-CA. Pumping Plant EE - E-Con concrete pump with 5" pump line sitting on pile driving trestle; March 21, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4348 NA Klamath Project, OR-CA. Pumping Plant EE - View looking north along west wall area at concrete placement for the foundation slab of Plant EE. Concrete was hauled to jobsite in 8 c.y. loads ...
Citation -
P12-201-4351 NA Klamath Project, OR-CA. E-Con placer elephant trunk placing concrete in plant EE slab; March 21, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4352 NA Klamath Project, OR-CA. Both E-Con placers in operation here, placing middle section of Plant EE slab. Left section was previously completed; March 21, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4353 NA Klamath Project, OR-CA. Finishers using scrreds to float out middle section of Plant EE slab; March 21, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4354 NA Klamath Project, OR-CA. Putting on final touches to Plant EE bottom slab placement. Began placing 300+ yds. at 7:45 a.m. and finished at 5 p.m.; March 21, 1977; USBR photo by D. J. Kl...
Citation -
P12-201-4355 NA Klamath Project, OR-CA. Water curing of level portion of Plant EE slab. Inlet section on a 1:4 slope was membrane cured. Note smudge pot heaters used to keep surface temperature above ...
Citation -
P12-201-4364 NA Klamath Project, OR-CA. Pumping Plant EE--E-Con placer with 50 ft. of 5" lining, placing concrete for walls at Plant EE. Placed an average of 40 cu. yds. per hour. Concrete was batched ...
Citation