Search
You searched for:
Start Over
Photos
Remove constraint Photos
Subject
Piping
Remove constraint Subject: Piping
« Previous | 41 - 50 of 67 | Next »
Search Results
-
41. [Image] Closed Drain Construction, Tule Lake Area, Sump 3 - Specs. 200C-910 - Patterson Constr. Co., Contractor
P-12-200-4009NA Klamath Project - Oregon-California. View of Closed Drain Outlet #46-1, with pipe running approximately one-half full; March 1975; USBR photo by D. W. SteinCitation -
P12-201-4284 NA Klamath Project OR-CA. Entire length of water jet pipe (40' long) and 3" in diameter; January 4, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4372 NA Klamath Project, OR-CA. Center Canal Flume--Completed pipeline traversing flume inlet curve. Pipe was racked to take curve naturally; May 23, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4395 NA Klamath Project, OR-CA. Pumping Plant EE--Installation of 48" RCP outlet pipes. Checking placements prior to adding second section of pipe. Note cradle excavated for 48" RCP and extra ...
Citation -
P12-201-4436 NA Klamath Project, OR-CA. Pumping Plant FF--View looking southeast at Plant FF outlet side. Second lift wall steel and 2 of 3 48" RCP discharge pipes are visible; August 16, 1977; USBR ...
Citation -
P12-201-4453 NA Klamath Project, OR-CA. Ady Canal--Shows 84" CMP Joint as made up by RHC. Joint is on west end of Mitered Bend. Note: how pipe is not set true. Armco, the pipe manufacturer, is to come ...
Citation -
P12-201-4455 NA Klamath Project, OR-CA. Ady Canal--View of siphon pipe laying operation looking from hwy. west toward RR. Pettibone 30 Multicrane used for lifting; September 1977; USBR photo by D.J. ...
Citation -
P12-201-4466 NA Klamath Project, OR-CA. PP FF--View looking south at placement of compacted back fill about the discharge pipes between FF and its outlet structure; October 1977; USBR photo by D.W. S...
Citation -
49. [Image] View of trench outlet and of closed drain trench
CN-12-201-205NA Klamath Project - Oregon-California. Note plastic pipe stub. Later, it will be connected to steel outlet pipe; December 1972; Bureau of Reclamation photo by D. W. SteinCitation -
50. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
CN-12-201-206NA Klamath Project - Oregon-California. Looking into trench where the steel pipe is attached to plastic drainage tubing; February 1973; Bureau of Reclamation photo by D. W. SteinCitation