  • 4249
    P-12-200-4167NA Klamath Project - Oregon-California; March 1976; USBR photo by Bob Hamilton
    Citation
  • 4253
    P-12-200-4171NA Klamath Project - Oregon-California; April 1976; USBR photo by Bob Hamilton
    Citation
  • 4316
    P-12-200-4233NA Klamath Project - Oregon-California. Rotary drill rig drilling wells for dewatering Pumping Plant "EE" site. Site was excavated to elev. 4070± and 24" wells were drilled 30± feet; 10" ...
    Citation
  • 4571
    P12-201-4489 NA Klamath Project, OR-CA. Second piece of RCP a 16' tangent is lowered into pipe trench by both 3500 Manitowo and 35 ton Manitowol. Two (2) cranes were required because the 3500 had only ...
    Citation
  • 4572
    P12-201-4490 NA Klamath Project, OR-CA. Lowering of 1st section of RCP into trench; December 2, 1977; USBR photo by D.J. Kline
    Citation
  • 4573
    P12-201-4491 NA Klamath Project, OR-CA. First sections of 24" RCP arrived today. Here a 15° mitre joint is being lifted off lowboy by 3500 Manitowoc; Dec. 2, 1977; USBR photo by D.J. Kline
    Citation
  • 4574
    P12-201-4492 NA Klamath Project, OR-CA. Template being used over screeding in placing bedding material for 84" RCP; December 2, 1977; USBR photo by D.J. Kline
    Citation
  • 4575
    P12-201-4493 NA Klamath Project, OR-CA. Putting in screeding and 84" RCP in preparation for pipe laying operation; Dec. 2, 1977; USBR photo by D.J. Kline
    Citation
  • 4581
    P12-201-4499 NA Klamath Project, OR-CA. Pumping Plant FF -- 3500 Manitowoc preparing to unload a section of 84" RCP from lowbow (sic). Note TD-20 cat in position to pull lowboy out of trench when load ...
    Citation
  • 4614
    P12-201-4532 NA Klamath Project, OR-CA. View of 8" pipe being removed due to bolts breaking at connection to 84" RCP (seen at the bottom). This had been completely backfilled and Constr. Inspector (D.W. ...
    Citation