Search
You searched for:
Start Over
Photos
Remove constraint Photos
Subject
Piping
Remove constraint Subject: Piping
« Previous | 11 - 20 of 67 | Next »
Search Results
-
KP-2262-R2 - Klamath Project--Tule Lake Division. Going around a curve in solid rock; November 30, 1954; Photo by Luther McAnulty
Citation -
KP-2263-R2 - Klamath Project--Tule Lake Division; November 30, 1954; Photo by Luther McAnulty
Citation -
13. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
CN-12-201-295NA Klamath Project - Oregon-California. Experimental Line in Unit 71. View of pipe in trench prior to backfilling. Note man’s foot on pipe in upper part of photo. No damage resulted when it ...Citation -
14. [Image] 24-inch 10 gage welded steel pipe load test
KP-1550-R2. Klamath Project. The pipe is filled with water under pressure for uniform loading, and loaded at third points with sand for concentrated loading; September 15, 1947; Photo by Dorwin GriseCitation -
15. [Image] Tule Lake Division - View showing installation of 24" Flume extension at Sta. 47+ on the N-1 Lateral
P12-200-2745A Tule Lake Division - Klamath Project -- Oregon-California. Note laborer applying sealer to the pipe prior to connecting the collar. George R. Stacy, Contractor, Specifications No. 200C-541; ...Citation -
16. [Image] Tule Lake Division - View showing the installation of Flume section which spans the 101-C-1 Drain at Sta. 47
P12-200-2746A Tule Lake Division - Klamath Project -- Oregon-California. George R. Stacy, Contractor, Specifications No. 200C-541; February 27, 1964; Bureau of Reclamation photo by D. W. SteinCitation -
KP-2398-R2 - Klamath Project - Lower Klamath Lake north bank of Lot 19 Lease Area "K". General view of north dike of lot 19 facing east showing headgates of pipe through dike. Shovel is on outlet of second ...
Citation -
KP-2399-R2 - Klamath Project - Lower Klamath Lake north bank of lot 19 Lease Area "K". Close up view showing the threatened break at the turnout pipes placed by Dan O'Conner to provide water through the ...
Citation -
KP-2568-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248, Q-1 Lateral. Installing prefabricated metal wasteway at the end of the Q-1 Lateral, Station 88+33.7. Backfill compacted ...
Citation -
KP-2590-R2-Klamath Project - TULE LAKE DIVISION, SUMP 3, Specifications DC-5389, Unit 1, N-1 Lateral. View of riprap about outlet of 48" culvert, Sta.74+58; March 25, 1961; Photo by S. C. Dugan
Citation