    KP-2527-R2-Klamath Project -- TULE LAKE SUMP 2, PUMPING PLANT 9. View looking northeast towards discharge structure showing form work and discharge pipes; September 24, 1959; Photo by K.J. Greene
    Citation
  • 3258
    KP-2374-R2 - Klamath Project--TULE LAKE DIVISION. Fine grading and placing 42" diameter concrete pipe to prevent seepage through rocky area; December 1956; Photo by L. McAnulty
    Citation
  • 3259
    KP-2375-R2 - Klamath Project--TULE LAKE DIVISION. Curling joints on 42" diameter control pipe; December 1956; Photo by L. McAnulty
    Citation
  • 1903
    KP-1550-R2. Klamath Project. The pipe is filled with water under pressure for uniform loading, and loaded at third points with sand for concentrated loading; September 15, 1947; Photo by Dorwin Grise
    Citation
  • 3878
    P12-200-2867NA Klamath Project - Oregon; May 16, 1969; Bureau of Reclamation photo by J. K. Bryant
    Citation
  • 3879
    P12-200-2868NA Klamath Project - Oregon; May 16, 1969; Bureau of Reclamation photo by J. K. Bryant
    Citation
  • 3122
    KP-2261-R2 - Klamath Project--Tule Lake Division. 42-inch pipe line in N-20-a Lateral, going through solid rock; November 30, 1954; Photo by Luther McAnulty
    Citation
  • 3123
    KP-2262-R2 - Klamath Project--Tule Lake Division. Going around a curve in solid rock; November 30, 1954; Photo by Luther McAnulty
    Citation
  • 3124
    KP-2263-R2 - Klamath Project--Tule Lake Division; November 30, 1954; Photo by Luther McAnulty
    Citation
  • 3450
    P12-200-2745A Tule Lake Division - Klamath Project -- Oregon-California. Note laborer applying sealer to the pipe prior to connecting the collar. George R. Stacy, Contractor, Specifications No. 200C-541; ...
    Citation