Search
You searched for:
Start Over
Irrigation
Remove constraint Irrigation
Subject
Piling (Civil engineering)
Remove constraint Subject: Piling (Civil engineering)
Material Types
Image
Remove constraint Material Types: Image
« Previous | 1 - 10 of 36 | Next »
Search Results
-
1. [Image] Lost River Channel Improvement, Langell Valley - Construction of timber bridge, Sta. 454-00
KP-1976-R2 - Klamath Project. Lost River Channel Improvement, Langell Valley. Picture was taken from southeast side of piling looking north downstream showing old bridge after all the new piles are driven; ...Citation -
KP-1977-R2 - Klamath Project. Lost River Channel Improvement, Langell Valley. Sta.454-00. Picture taken from east side showing condition of piling before tops are cut off. Louis Petzoldt, inspecting; ...
Citation -
3. [Image] Lost River Channel Improvement, Langell Valley - Construction of timber bridge, Sta. 454-00
KP-1978-R2 - Klamath Project. Telephoto. Lost River Channel Improvement, Langell Valley. Picture taken from east side of bridge showing alignment of piling and condition thereof. Mr. Louis Petzoldt inspecting; ...Citation -
4. [Image] Lost River Channel Improvement, Langell Valley - Construction of timber bridge, Sta. 454-00
KP-1980-R2 - Klamath Project. Telephoto. Lost River Channel Improvement, Langell Valley. Picture taken from southwest side showing top of pile and hammer after pile is driven; June 15, 1950; Photo by ...Citation -
KP-1981-R2 - Klamath Project. Lost River Channel Improvement, Langell Valley. Sta.454-00. Picture taken underneath bridge showing vertical cracks in piling. This pile will remain under bridge. Bob Caster, ...
Citation -
6. [Image] Klamath Straits Drain - Middle Canal Flume
KP-2070-R2 - Klamath Project. Klamath Straits Drain. Middle Canal Flume. Northeast side of flume showing newly driven piles. Piles are to support a concrete beam which will be poured after apron is ...Citation -
P12-201-4562NA Klamath Project, OR-CA. Center Canal Flume Bridge. The steel sleeve was placed on the pile and the holes in the sleeve were marked on the pile. The sleeve was then removed and a ship's ...
Citation -
P12-201-4563NA Klamath Project, OR-CA. Center Canal Flume Bridge. Torquing the 14" x 3/4" steel bolts connecting the steel sleeve to bottom piling; April 4, 1978; USBR photo by D.J. Kline
Citation -
P12-201-4564NA Klamath Project, OR-CA. Center Canal Flume Bridge. The top or splice piling is inserted into the sleeve and then the ship's auger was used to bore out the hole for the 3/4 " bolt; April ...
Citation -
10. [Image] Lost River Channel Improvement, Langell Valley
KP-1945 - Klamath Project. Lost River Channel Improvement, Langell Valley. Picture of bridge at Sta. 454-01 on Lost River just before replacement of piling. Picture taken from northwest side of Bridge. ...Citation