Search
You searched for:
Start Over
Photos
Remove constraint Photos
Subject
N-Canal (California)
Remove constraint Subject: N-Canal (California)
« Previous | 1 - 10 of 103 | Next »
Search Results
-
1. [Image] N-16 Lateral - Lower Cost Canal Lining
KP-1882 - Klamath Project. N-16 Lateral. Lower Cost Canal Lining. Photo shows channel in distance with George L. Browning in the foreground painting the edge of the first asphalt strip with a solvent ...Citation -
2. [Image] N-Canal Timber Bridge
KP-1107-R2 - Klamath Project; General view looking east up the canal. Bridge at Station 138 70.5; March 23, 1945; Photo by R. S. HopkinsCitation -
3. [Image] N-Canal Area, 2nd Extension
KP-2166-R2 - Klamath Project. Welded steel pipe turnout flume crossing adjacent toe drain. George R. Stacy, contractor, Specs. DC-3445; June 13, 1952; Bureau of Reclamation Photo by Mark D. Taylor, Jr....Citation -
4. [Image] Dike Stability Studies
KP-1679 - Klamath Project - Dike Stability Studies. Berm slide 600 ft. East of N-12-b Lateral on the South side of the N-12 Lateral; March 10, 1948; Photo by H. F. TolleyCitation -
5. [Image] Dike Stability Studies
KP-1680 - Klamath Project - Dike Stability Studies. Berm sloughing into newly constructed drain 600 ft. East of N-12-b Lateral on the South side of the N-12 Lateral; March 10, 1948; Photo by H. F. Toll...Citation -
6. [Image] Dike Stability Studies
KP-1681 - Klamath Project - Dike Stability Studies. Berm sloughing into newly constructed drain 600 feet East of N-12-b Lateral on the South side of the N-12 Lateral; March 10, 1948; Photo by H. F. Tol...Citation -
7. [Image] Dike Stability Studies
KP-1683 - Klamath Project - Dike Stability Studies. Settled portion of N-12 Lateral bank near "A" Dike, looking East; April 5, 1948; Photo by D. E. GriseCitation -
8. [Image] Dike Stability Studies
KP-1684 - Klamath Project. Dike Stability Studies. Settled portion of N-12 Lateral bank near "A" Dike, looking across the lateral; April 5, 1948; Photo by D. E. GriseCitation -
9. [Image] Dike Stability Studies
KP-1685 - Klamath Project. Dike Stability Studies. Settled portion of N-12 Lateral bank near "A" Dike, looking East; April 5, 1948; Photo by D. E. GriseCitation -
10. [Image] "N" Canal Improvement - Dragline leveling old East Bank and Digging Puddle Trench to destroy seepage cracks
KP-1706 - Klamath Project. "N" Canal Improvement; July 8, 1948; Photo by Dorwin GriseCitation