Search

You searched for: Start Over Photos Remove constraint Photos Subject Klamath Straits Drain (Oregon) Remove constraint Subject: Klamath Straits Drain (Oregon)

Search Results

  • 4509
    P12-201-4428 NA Klamath Project, OR-CA. Ady Canal--due to damaged gates, contractor building a bulkhead for dewatering Ady Canal to excavate for siphon; August 29, 1977; USBR photo by D.J. Kline
    Citation
  • 4511
    P12-201-4430 NA Klamath Project, OR-CA. Ady Canal, Hwy 97, and SPRR Siphon-- Contractor forces repairing bedding for Hwy 97 which is sloughed out when shoring on the east side of the hwy shifted. This ...
    Citation
  • 4512
    P12-201-4421 NA Klamath Project, OR-CA. Reinforcement added at Pace Engineering request (designer of shoring for siphon) for Hwy 97 tunnel east portal. OSHA approved this design to prevent further sloughing ...
    Citation
  • 4513
    P12-201-4431 NA Klamath Project, OR-CA. Ady Canal--Initial shoring installed to prevent further failure of the east shoring at Hwy 97. This was installed on Aug. 17 prior to the tunnel shield fully exiting ...
    Citation
  • 4514
    P12-201-4432 NA Klamath Project, OR-CA. Ady Canal--the cribbing was cut with a chainsaw and tunnel shield pushed through the hole using hydraulics. View looking west as the shield exits through the shoring; ...
    Citation
  • 4515
    P12-201-4433 NA Klamath Project, OR-CA. Ady Canal--View looking east through completed tunnel liner; August 19, 1977; USBR photo by D.J. Kline
    Citation
  • 4516
    P12-201-4434 NA Klamath Project, OR-CA. Ady Canal--View looking east across Hwy 97 over tunnel site. Depression caused by shoring failure is visible on far side of road surface; August 19, 1977; USBR ...
    Citation
  • 4517
    P12-201-4435 NA Klamath Project, OR-CA. View looking south east across Hwy 97 at tunnel site. Solid white hwy shoulder line dips over tunnel indicating settlement in the road surface; August 19, 1977; ...
    Citation
  • 4518
    P12-201-4436 NA Klamath Project, OR-CA. Pumping Plant FF--View looking southeast at Plant FF outlet side. Second lift wall steel and 2 of 3 48" RCP discharge pipes are visible; August 16, 1977; USBR ...
    Citation
  • 4519
    P12-201-4437 NA Klamath Project, OR-CA. Pumping Plant FF--View southwest at plant. Second lift wall steel and door frames are in position; August 16, 1977; USBR photo by D.J. Kline
    Citation