Search

You searched for: Start Over Photos Remove constraint Photos Subject Klamath Straits Drain (Oregon) Remove constraint Subject: Klamath Straits Drain (Oregon)

Search Results

  • 4431
    P12-201-4350 NA Klamath Project, OR-CA. Transit mixer in position to empty mix into hopper of E-Con placer truck; March 21, 1977; USBR photo by D. J. Kline
    Citation
  • 4432
    P12-201-4351 NA Klamath Project, OR-CA. E-Con placer elephant trunk placing concrete in plant EE slab; March 21, 1977; USBR photo by D. J. Kline
    Citation
  • 4433
    P12-201-4352 NA Klamath Project, OR-CA. Both E-Con placers in operation here, placing middle section of Plant EE slab. Left section was previously completed; March 21, 1977; USBR photo by D. J. Kline
    Citation
  • 4434
    P12-201-4353 NA Klamath Project, OR-CA. Finishers using scrreds to float out middle section of Plant EE slab; March 21, 1977; USBR photo by D. J. Kline
    Citation
  • 4435
    P12-201-4354 NA Klamath Project, OR-CA. Putting on final touches to Plant EE bottom slab placement. Began placing 300+ yds. at 7:45 a.m. and finished at 5 p.m.; March 21, 1977; USBR photo by D. J. Kl...
    Citation
  • 4436
    P12-201-4355 NA Klamath Project, OR-CA. Water curing of level portion of Plant EE slab. Inlet section on a 1:4 slope was membrane cured. Note smudge pot heaters used to keep surface temperature above ...
    Citation
  • 4438
    P12-201-4356 NA Klamath Project, OR-CA. Six electric motors safely unloaded and protective bisqueen covering in place; March 22, 1977; USBR photo by D. J. Kline
    Citation
  • 4440
    P12-201-4358 NA Klamath Project, OR-CA. Pumping Plant FF pile driving completed. Tension connector being put into place. View looking east toward inlet of plant; April 26, 1977; USBR photo by D. J. K...
    Citation
  • 4441
    P12-201-4359 NA Klamath Project, OR-CA. Applying final concrete lift on this section (SW corner) of Plant FF bottom slab; May 5, 1977; USBR photo by D. J. Kline
    Citation
  • 4442
    P12-201-4360 NA Klamath Project, OR-CA. Placement of bottom slab at Plant FF ( 300+Yd³). 10 cu. yd. transit mixer backing down ramp to discharge into hopper of E-Con placer; May 5, 1977; USBR photo by ...
    Citation