Search

You searched for: Start Over Photos Remove constraint Photos Subject Klamath Straits Drain (Oregon) Remove constraint Subject: Klamath Straits Drain (Oregon)

Search Results

  • 4619
    P12-201-4537NA Klamath Project, OR-CA. Pumping Plant E -- SW corner of Plant E where water return was coming from pile driving jetting operations while working on west side of additional piling of ...
    Citation
  • 4620
    P12-201-4538NA Klamath Project, OR-CA. View of jetting nozzle built by contractor in accordance with recommendations of an engineering geologist; March 20, 1978; USBR photo by R.J. Hamilton
    Citation
  • 4621
    P12-201-4539NA Klamath Project, OR-CA. Plant E Outlet Transition Bridge -- Water jetting from nozzle. Water jet traveled approx. 4 ft. horizontally before hitting the imaginary ground surface (est. 22 ...
    Citation
  • 4622
    P12-201-4540NA Klamath Project, OR-CA. Plant E Outlet Transition Bridge -- Water flowing from base of the left retaining wall at Plant E. Flow was a by-product of jetting operations for Plant E west ...
    Citation
  • 4623
    P12-201-4541NA Klamath Project, OR-CA. Plant E. Outlet Transition Bridge -- View of Gorman-Rupp jetting pump imported by contractor. Note the undersized intake and exhaust fittings; March 20, 1978; USBR ...
    Citation
  • 4628
    P12-201-4546NA Klamath Project, OR-CA. Center Canal Flume Bridge. For safety of flume, water jet return trench was excavated from east side of pile trench to KSD. No jetting return was evident in flume ...
    Citation
  • 4629
    P12-201-4547NA Klamath Project, OR-CA. Center Canal Flume Bridge. Jet trench excavated on north side of flume, same design as south side return trench. This trench did not work, however, as jetting ...
    Citation
  • 4631
    P12-201-4549NA Klamath Project, OR-CA. Center Canal Flume Bridge. Wet area shows where unwanted jetting return was exiting into the west side of the drain on NE side of the flume; April 5, 1978; USBR ...
    Citation
  • 4632
    P12-201-4550NA Klamath Project, OR-CA. Center Canal Flume Bridge. Lowered water level in flume. Refilled first jet return trench and dug a second deeper trench on an angle toward Pumping Plant E. These ...
    Citation
  • 4633
    P12-201-4551NA Klamath Project, OR-CA. Center Canal Flume Bridge. Second return trench was cut into portions of the pile trench and worked well along with other measures to contain jet return; April ...
    Citation