  • 4584
    P12-201-4502 NA Klamath Project, OR-CA. Center Canal Flume -- View of west dike on inlet to flume. This was built up for flume repairs. Note portable gas dewatering pump at base of dike used for flume ...
    Citation
  • 4587
    P12-201-4505 NA Klamath Project, OR-CA. Center Canal Flume -- View of second repaired joint where slope walls join vertical walls. This was repaired the same as the first joint; January 12, 1978; USBR ...
    Citation
  • 4588
    P12-201-4506 NA Klamath Project, OR-CA. Center Canal Flume -- View of floor and south wall looking down at the joint between the new and old portions of the flume. This joint was repaired using a rubber ...
    Citation
  • 4589
    P12-201-4507 NA Klamath Project, OR-CA. Center Canal Flume -- View showing removal of Center Canal Flume inlet dike after completion of flume repairs. Case 580-C Extend-A-Hoe used for dike removal; January ...
    Citation
  • 4590
    P12-201-4508 NA Klamath Project, OR-CA. Center Canal Flume -- View looking SE at outlet area of Center Canal Flume after second dewatering was removed and after flume repairs were completed; January 13, ...
    Citation
  • 4591
    P12-201-4509 NA Klamath Project, OR-CA. Pumping Plant EE -- View of inlet areas of Plants E and EE. Note Plant EE was allowed to flood after removing of dewatering apparatus due to lull in construction ...
    Citation
  • 4593
    P12-201-4511 NA Klamath Project, OR-CA. Pumping Plant FF -- View of inlet to siphon at Plant FF; January 27, 1978; USBR photo by D.J. Kline
    Citation
  • 4595
    P12-201-4513 NA Klamath Project, OR-CA. Ady Canal -- View of west bank of SP RR after outler (sic) layer of cribbing and reinforcement were removed. It was deemed unsafe to remove anymore of this cribbing. ...
    Citation
  • 4597
    P12-201-4515 NA Klamath Project, OR-CA. Ady Canal -- View of outlet transition slab prior to placement. Note heater and tank which will be used to keep temperature above 50° F; February 20, 1978; USBR ...
    Citation
  • 4599
    P12-201-4517 NA Klamath Project, OR-CA. Pumping Plant FF -- View of surface damage to 2,500 volt primary controller. This damage apparently took place during shipment from the east coast; February 28, ...
    Citation