Search
You searched for:
Start Over
Irrigation
Remove constraint Irrigation
Subject
Klamath Straits Drain (Oregon)
Remove constraint Subject: Klamath Straits Drain (Oregon)
Subject
Pumping Plant E (Oregon)
Remove constraint Subject: Pumping Plant E (Oregon)
Material Types
Image
Remove constraint Material Types: Image
« Previous | 1 - 10 of 41 | Next »
Search Results
-
P-12-200-4021 NA Klamath Project, California-Oregon. The Klamath Project has a system of canals, laterals, and drains which provide irrigation facilities for 85,000 acres and approximately 95,000 acres ...
Citation -
P12-200-2686 - Klamath Project, Oregon - KLAMATH STRAITS DRAIN, flume across Klamath Straits Drain at Pumping Plant E. View of south side of flume looking west, showing material that was eroded into the ...
Citation -
P12-200-2687 - Klamath Project, Oregon - KLAMATH STRAITS DRAIN flume across Klamath Straits Drain at Pumping Plant E. View of north side of flume looking west, showing material that was eroded into the ...
Citation -
P12-200-2688 - Klamath Project, Oregon - KLAMATH STRAITS DRAIN, flume across Klamath Straits Drain at Pumping Plant E. Closeup view of north side of flume showing where the material was eroded away from ...
Citation -
5. [Image] Klamath Straits Drain Outlet
KP-1135-R2 - Klamath Project; Concrete mixing plant of the Tru-Mix Concrete Company at Pumping Plant "E", showing aggregate bins, batching hopper, mixer and the pumpcrets machine used for the delivery ...Citation -
P12-201-4304 NA Klamath Project, OR-CA. Snall (sic) leak developing on west bank about midway and ±6' down from excavation surface at Plant E; December 1976; USBR photo by D. J. Kline
Citation -
P12-201-4343 NA Klamath Project, OR-CA. Removal of Bent #4 of pile driving trestle with associated braces. Piling was cut off approx. 5" above sub-grade. Remainder of bridge left in place for construction ...
Citation -
P-12-200-4231NA Klamath Project - Oregon-California. Pumping Plant "E" area, rt. side of downstream transition. View of showing seepage at elev. 4070± at toe of contractors excavation; September 1976; ...
Citation -
P12-201-4477 NA Klamath Project, OR-CA. Spoils removed from west side of PP 'E' bridge pile location sites. Note large rock; November 16, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4478 NA Klamath Project, OR-CA. View of a typical hole excavated by contractor to a depth of 12'. At this point material thinned out. Also this was maximum depth attainable by Case 580C Extend-a-Hoe; ...
Citation