« Previous | 1 - 10 of 24 | Next »
Search Results
-
P-12-200-4157NA Klamath Project - Oregon-California. View of drain pipe in trench. The operator raised coulters for this view. Photo shows 4-inch pipe with drain guard about 5' below natural ground; ...
Citation -
P-12-200-4158NA Klamath Project - Oregon-California. View of drain pipe in trench. The operator raised the coulters for this view. Photo shows 8-inch pipe about 6.5 ft. below natural ground surface. ...
Citation -
P-12-200-4171NA Klamath Project - Oregon-California; April 1976; USBR photo by Bob Hamilton
Citation -
P-12-200-4233NA Klamath Project - Oregon-California. Rotary drill rig drilling wells for dewatering Pumping Plant "EE" site. Site was excavated to elev. 4070± and 24" wells were drilled 30± feet; 10" ...
Citation -
P12-201-4489 NA Klamath Project, OR-CA. Second piece of RCP a 16' tangent is lowered into pipe trench by both 3500 Manitowo and 35 ton Manitowol. Two (2) cranes were required because the 3500 had only ...
Citation -
P12-201-4490 NA Klamath Project, OR-CA. Lowering of 1st section of RCP into trench; December 2, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4491 NA Klamath Project, OR-CA. First sections of 24" RCP arrived today. Here a 15° mitre joint is being lifted off lowboy by 3500 Manitowoc; Dec. 2, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4492 NA Klamath Project, OR-CA. Template being used over screeding in placing bedding material for 84" RCP; December 2, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4493 NA Klamath Project, OR-CA. Putting in screeding and 84" RCP in preparation for pipe laying operation; Dec. 2, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4499 NA Klamath Project, OR-CA. Pumping Plant FF -- 3500 Manitowoc preparing to unload a section of 84" RCP from lowbow (sic). Note TD-20 cat in position to pull lowboy out of trench when load ...
Citation