1. [Image] Klamath Straits Drain - Middle Canal Flume
KP-2070-R2 - Klamath Project. Klamath Straits Drain. Middle Canal Flume. Northeast side of flume showing newly driven piles. Piles are to support a concrete beam which will be poured after apron is ...Citation -
P12-201-4562NA Klamath Project, OR-CA. Center Canal Flume Bridge. The steel sleeve was placed on the pile and the holes in the sleeve were marked on the pile. The sleeve was then removed and a ship's ...
Citation -
P12-201-4563NA Klamath Project, OR-CA. Center Canal Flume Bridge. Torquing the 14" x 3/4" steel bolts connecting the steel sleeve to bottom piling; April 4, 1978; USBR photo by D.J. Kline
Citation -
P12-201-4564NA Klamath Project, OR-CA. Center Canal Flume Bridge. The top or splice piling is inserted into the sleeve and then the ship's auger was used to bore out the hole for the 3/4 " bolt; April ...
Citation -
P12-201-4391 NA Klamath Project, OR-CA. View of piling on north side of flume. Also note temporary pier built on piling originally used by contractor for false work in construction of flume; June 16, 1977; ...
Citation -
P12-201-4464 NA Klamath Project, OR-CA. Center Canal Flume--Old timber piling used for flume support in original construction. 12' long max. Note: Tip of piling was pre-sharpened; October 1977; USBR ...
Citation -
P-12-200-4193NA Klamath Project - Oregon-California. Drain inlet structure at Sta. 69+20, left. Sheet piling is being installed; June 1976; USBR photo by D. W. Stein
Citation -
P-12-200-4194NA Klamath Project - Oregon-California. Drain inlet structure at Sta. 69+20, left. Sheet piling is being installed; June 1976; USBR photo by D. W. Stein
Citation -
P12-201-4479 NA Klamath Project, OR-CA. Contractor had to pre-excavate sites where PP 'E' bridge piling would be driven. During construction of PP 'E', a pit run material was used for backfill. Apparently ...
Citation -
P12-201-4542NA Klamath Project, OR-CA. Pumping Plant E Outlet Bridge. Photo shows 3500 Manitowoc on ramp on top of west side bridge piles. This ramp was made so pile driving rig could reach across the ...
Citation