Search
You searched for:
Start Over
Photos
Remove constraint Photos
Subject
Klamath Project (U.S.) -- History
Remove constraint Subject: Klamath Project (U.S.) -- History
« Previous | 2,351 - 2,360 of 2,568 | Next »
Search Results
-
2351. [Image] Area on Wampler’s lease on Upper Klamath
CN-12-201-481NA Klamath Project - Oregon. Area on Wampler’s lease on Upper Klamath showing where native grasses and sedges are moving to an area where only cattails and wiregrass grew before; August 26, ...Citation -
2352. [Image] Weed sprayer purchased for soil & moisture work on Federal withdrawn lands, March 25, 1974
CN-12-201-484-NA Klamath Project - Oregon-California. 200 gallon tank, #1200 diaphragm pump with 7 H.P. motor. 25 foot 3-piece boom, with 6508 Tee Jets, required valves and 200'3/8" spray hose and needed ...Citation -
CN-12-201-488NA Klamath Project - Oregon-California; August 29, 1974; USBR photo by J. W. Legg
Citation -
2354. [Image] Closed Drain Construction, Tule Lake, Sump 3 Specs. 200C-910 - Patterson Constr. Co., Contractor
CN-12-201-492NA Klamath Project - Oregon-California. View showing 8 cubic yard John Deere self-loading scraper excavating material from field to fill open drains; November 1974; USBR photo by D. W. Ste...Citation -
2355. [Image] Closed Drain Construction, Tule Lake, Sump 3 Specs. 200C-910 - Patterson Constr. Co., Contractor
CN-12-201-493NA Klamath Project - Oregon-California. Another view showing 8 cubic yard John Deere scraper excavating material from field to fill open drains; November 1974; USBR photo by D. W. SteinCitation -
2356. [Image] Closed Drain Construction, Tule Lake, Sump 3 Specs. 200C -910 - Patterson Constr. Co., Contractor
CN-12-201-494NA Klamath Project - Oregon-California. Another view showing John Deere scraper excavating material from field to fill open drains; November 1974; USBR photo by D. W. SteinCitation -
2357. [Image] Closed Drain Construction, Tule Lake, Sump 3 Specs. 200C- 910 - Patterson Constr. Co., Contractor
CN-12-201-495NA Klamath Project - Oregon-California. View of John Deere self-loading scraper making the 0.5 ft. fill over the open drains to be filled; November 1974; USBR photo by D. W. SteinCitation -
2358. [Image] Closed Drain Construction, Tule Lake, Sump 3 Specs. 200C-910 - Patterson Constr. Co., Contractor
CN-12-201-498NA Klamath Project - Oregon-California. View showing outlet end of open drain area that has been stripped in preparation to place consolidated fill; November 1974; USBR photo by D. W. Ste...Citation -
2359. [Image] Closed Drain Construction, Tule Lake, Sump 3 Specs. 200C-910 - Patterson Constr. Co., Contractor
CN-12-201-500NA Klamath Project - Oregon-California. View showing #12 Motor Patrol shaping and completing open drain that was filled; November 1974; USBR photo by D. W. SteinCitation -
2360. [Image] Closed Drain Construction, Tule Lake, Sump 3 Specs. 200C-910 - Patterson Constr. Co., Contractor
CN-12-201-499NA Klamath Project - Oregon-California. D-8 dozer filling open drain and track rolling; November 1974; USBR photo by D. W. SteinCitation