« Previous | 191 - 200 of 2,568 | Next »
Search Results
-
191. [Image] Dike Stability Studies
KP-1679 - Klamath Project - Dike Stability Studies. Berm slide 600 ft. East of N-12-b Lateral on the South side of the N-12 Lateral; March 10, 1948; Photo by H. F. TolleyCitation -
192. [Image] Dike Stability Studies
KP-1680 - Klamath Project - Dike Stability Studies. Berm sloughing into newly constructed drain 600 ft. East of N-12-b Lateral on the South side of the N-12 Lateral; March 10, 1948; Photo by H. F. Toll...Citation -
193. [Image] Dike Stability Studies
KP-1681 - Klamath Project - Dike Stability Studies. Berm sloughing into newly constructed drain 600 feet East of N-12-b Lateral on the South side of the N-12 Lateral; March 10, 1948; Photo by H. F. Tol...Citation -
KP-1682 - Klamath Project - Seepage Studies. Note that the seepage cracks are located in the undisturbed natural ground beneath the lateral embankment. Parallel drain is constructed to intercept seepage ...
Citation -
195. [Image] Dike Stability Studies
KP-1683 - Klamath Project - Dike Stability Studies. Settled portion of N-12 Lateral bank near "A" Dike, looking East; April 5, 1948; Photo by D. E. GriseCitation -
196. [Image] Dike Stability Studies
KP-1684 - Klamath Project. Dike Stability Studies. Settled portion of N-12 Lateral bank near "A" Dike, looking across the lateral; April 5, 1948; Photo by D. E. GriseCitation -
197. [Image] Dike Stability Studies
KP-1685 - Klamath Project. Dike Stability Studies. Settled portion of N-12 Lateral bank near "A" Dike, looking East; April 5, 1948; Photo by D. E. GriseCitation -
198. [Image] Lower Cost Canal Lining - Close-up of J-3 Lateral
KP-1686 - Klamath Project. Lower Cost Canal Lining. M-C-O oil lined section over asphalt membrane lining; April 5, 1948; Photo by D. E. GriseCitation -
199. [Image] Lower Cost Canal Lining - Close-up of J-3 Lateral
KP-1687 - Klamath Project. Lower Cost Canal Lining. M-C-O oil lined section over asphalt membrane lining; April 5, 1948; Photo by D. E. GriseCitation -
200. [Image] Low Cost Canal Lining - J-3 Lateral
KP-1688 - Klamath Project. Low Cost Canal Lining. Spreading Volclay bentonite on bank to eliminate seepage. 18-inch earthcover still to be placed to provide protection against mechanical injury; March ...Citation