  • 4453
    P12-201-4371 NA Klamath Project, OR-CA. View of outlet of 24-inch CMP and dike; May 21, 1977; USBR photo by D. J. Kline
    Citation
  • 4454
    P12-201-4372 NA Klamath Project, OR-CA. Center Canal Flume--Completed pipeline traversing flume inlet curve. Pipe was racked to take curve naturally; May 23, 1977; USBR photo by D. J. Kline
    Citation
  • 4459
    P12-201-4377 NA Klamath Project, OR-CA. Pumping Plant FF--View looking south of concrete placement for walls up to base of Elev. B slab; May 31, 1977; USBR photo by D. J. Kline
    Citation
  • 4460
    P12-201-4378 NA Klamath Project, OR-CA. Pumping Plant FF--View looking west at placement for slab foundation. E-Con placer setting up to unload mixer truck; May 1977; USBR photo by D. J. Kline
    Citation
  • 4461
    P12-201-4379 NA Klamath Project, OR-CA. Pumping Plant FF--Placement for foundation slab; two bays completed and preparing to start on third and last bay. View looking sw. Workers at inlet side of slab; ...
    Citation
  • 4462
    P12-201-4380 NA Klamath Project, OR-CA. Pumping Plant FF--View looking southeast: slab completed. Burke-White pigmented curing compound has been applied by spray. Three smudge pot heaters placed in ...
    Citation
  • 4463
    P12-201-4381 NA Klamath Project, OR-CA. Pumping Plant EE--Preparation for placement of pump deck (Elev. B) slab. Note contractor wetting down rebar prior to placement; May 20, 1977; USBR photo by D. ...
    Citation
  • 4464
    P12-201-4382 NA Klamath Project, OR-CA. Pumping Plant EE--Note carpenters re-checking elevations on miscellaneous metals and concrete screeds; May 20, 1977; USBR photo by D. J. Kline
    Citation
  • 4465
    P12-201-4383 NA Klamath Project, OR-CA. Pumping Plant EE--Placement of final section of Plant EE Elev. B slab; May 20, 1977; USBR photo by D. J. Kline
    Citation
  • 4466
    P12-201-4384 NA Klamath Project, OR-CA. Center Canal Flume--North side of flume joint--Separation of old flume and newly constructed section of flume;separation at top was .21 of a foot at the worst point. ...
    Citation