  • 1691. [Image] Link River Dam
    2802
    KP-2089-R2 - Klamath Project. Link River Dam. Link River, from a point about 1,000 feet downstream, shows Ankeny Canal at right, tailrace in center and Keno Canal at left. Forebay and dam in background. ...
    Citation
  • 1692. [Image] Link River Dam
    2803
    KP-2090-R2 - Klamath Project. Link River Dam. Link River from a point about 1,300 feet downstream from the dam. Keno Canal at left. Spillway in center and Ankeny Canal at right; February 7, 1951; Photo ...
    Citation
  • 2830
    KP-2117-R2. Jack Wynant, ditchrider, receiving incentive award check from R. S. Hopkins, Irrigation Manager, Klamath Project, for the use of water on saw in cutting rolled asphalt material; April 9, 1952; ...
    Citation
  • 2874
    KP-2160-R2 - Klamath Project. Lost River Channel Improvement, Langell Valley. General view looking downstream from Station 235+50 on left bank. Right-of-way being prepared to hold wet excavation material ...
    Citation
  • 2879
    KP-2165-R2 - Klamath Project. Lost River Channel Improvement, Langell Valley. General view looking upstream from Station 223+50. Picture shows old existing spoil banks and drain. McKinnon Construction ...
    Citation
  • 2885
    2171-R2 - Link River Dam Repair by The California-Oregon Power Company. Klamath Project, Oregon-California. Reinforcement at base of wall and intersection with gates and new concrete trajectory; November ...
    Citation
  • 2890
    2176-R2 - Link River Dam Repair by The California-Oregon Power Company. Klamath Project, Oregon-California. Right abutment; general view of forms for sloped area with steel almost ready for initial concrete; ...
    Citation
  • 3959
    P12-200-2947NA Klamath Project - Oregon-California. View alongside of trencher showing horizontal alignment staffs. The operator sighted down the poles and was able to obtain very good alignment; December ...
    Citation
  • 3961
    P12-200-2949NA Klamath Project - Oregon-California. Clear Lake Spillway Rehabilitation - Specs. 200C-889 - Roy D. Garren Corporation, Contractor Service Steel Erection. View of spillway slab crest area, ...
    Citation
  • 3962
    P-12-200-2950NA Klamath Project - Oregon-California. Clear Lake Spillway Rehabilitation - Specs. 200C-889 - Roy D. Garren Corporation, Contractor Don D. Thompson, Sub-contractor. Spillway crest atea, ...
    Citation