    KP-1860 - Klamath Project. Lost River Diversion Channel Enlargement. Replacing concrete sections. New piers and new wingwalls are covered with dirt to prevent freezing of fresh concrete. Jack Jorgensen ...
    Citation
  • 2368
    KP-1865 - Klamath Project. Lower Cost Canal Lining - N-16 Lateral. Buried asphalt membrane showing condition of healed joint. Lap was welded together with burner. Test hole was dug half-way up north ...
    Citation
  • 2369
    KP-1866 - Lower Cost Canal Lining - N-16 Lateral. Same as No. 1865 [number "20" is crossed out and "1865" handwritten in] with seam cut open with linoleum knife. Picture shows that membrane is sealed ...
    Citation
  • 2371
    KP-1868 - Klamath Project. Lower Cost Canal Lining - N-16 Lateral. Same as No. 1867 [number "5" is crossed out, "1867" is handwritten in], showing adhesiveness of RC-0. Top lap has been cut and bent ...
    Citation
  • 2372
    KP-1869 - Klamath Project. Lower Cost Canal Lining - N-16 Lateral. Detail of buried asphalt membrane on north side. Picture shows condition of seam at bottom of slope. A small wrinkle has flattened ...
    Citation
  • 2373
    KP-1870 - Klamath Project. Lower Cost Canal Lining - N-16 Lateral. Same as No. 1869 [handwritten, number "22" crossed out] with seam cut open. Due to the short length of time membrane is not completely ...
    Citation
  • 2375
    KP-1872 - Klamath Project. Lower Cost Canal Lining - N-16 Lateral. Sta. 83-00, north side of channel. Picture reveals wrinkle where asphalt did not seal. Also a crack is uncovered which had been doctored ...
    Citation
  • 2387
    KP-1884 - Klamath Project. N-16 Lateral. Lower cost canal lining. Laying of second strip of asphalt membrane with approximately 2-inch overlap. George L. Browning and L. G. Oliensis on far side of ...
    Citation
  • 2394
    KP-1891 - Klamath Project. Lower cost canal lining. This shows the dipping process which took the place of painting each side of the asphalt strips with a brush. A. J. Lommasson, instructing. Plant ...
    Citation
  • 2395
    KP-1892 - Klamath Project. Lower cost canal lining. Heating shack in background. Due to cold weather, asphalt sheets cracked when unrolled, so rolls were put inside building to be kept warm; December ...
    Citation