Search

You searched for: Start Over Photos Remove constraint Photos Subject Klamath Project (U.S.) -- History Remove constraint Subject: Klamath Project (U.S.) -- History

Search Results

  • 4059
    P-12-200-3046NA Klamath Project - Oregon-California. View of right wall looking north, cut-off wall is in center of photo; June 1974; USBR photo by D. W. Stein
    Citation
  • 4066
    P-12-200-3053NA Klamath Project - Oregon-California. View of borrow area near dam after material had been borrowed. The area has been dressed up by contractor. (Borrow can be noted at center and at right ...
    Citation
  • 4095
    P-12-200-3082NA Klamath Project - Oregon-California. View looking east on closed drain #19-1, with trencher and 10 cubic yard end dump truck in background. Note water in trench. Outlet pipe was running ...
    Citation
  • 4107
    P-12-200-3094NA Klamath Project - Oregon-California. View of outlet area, looking downstream Line #53-1. Note heavy flow of water. Solid pipe and cut-off collar to the right of photo is to be installed; ...
    Citation
  • 4108
    P-12-200-3095NA Klamath Project - Oregon-California. View of outlet area, looking downstream Line #53-1. Note heavy flow of water. Solid pipe and cut-off collar at right of photo is to be installed; ...
    Citation
  • 4134
    P-12-200-4021 NA Klamath Project, California-Oregon. The Klamath Project has a system of canals, laterals, and drains which provide irrigation facilities for 85,000 acres and approximately 95,000 acres ...
    Citation
  • 3118
    KP-2257-R2 - Klamath Project--A-3-a Lateral. (See also Photo No. KP-2258-R2 looking upstream from same bridge.) Banks not pastured. Ditch in poor condition. New gate and 18-inch corrugated-metal pipe ...
    Citation
  • 4409
    P12-201-4327 NA Klamath Project, OR-CA. Center Canal Flume - View of completed outlet transition of flume. Notice rebar at center left of photo which is for the flume crossing floor; February 17, 1977; ...
    Citation
  • 4437
    P12-201-4346 NA Klamath Project, OR-CA. View looking north (downstream). Beginning of placement of over 300 yd³ of concrete for foundation slab. Not (sic) 3 sump well blockouts. Also, in foreground, ...
    Citation
  • 4439
    P12-201-4357 NA Klamath Project, OR-CA. At Plant FF site, conduit trenches excavated to a depth of 2 feet, with 1" rigid and 3" rigid electric conduit in place for metering and 2.5kv runs. Notice northeast ...
    Citation