Search
You searched for:
Start Over
Irrigation
Remove constraint Irrigation
Subject
Klamath Project (U.S.) -- History
Remove constraint Subject: Klamath Project (U.S.) -- History
Subject
Trucks
Remove constraint Subject: Trucks
« Previous | 1 - 10 of 47 | Next »
Search Results
-
KP-2569-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248, Q-2 Lateral. Water truck sprinkling material placed by Hancock Elevating Scraper for lining of Q-2 Lateral, Station 22+00 ...
Citation -
2. [Image] Looking North up J-18 Lateral before spraying top of banks had been disced to remove weed growth
KP-1178-R2 Klamath Project; June 13, 1946; Photo by R. S. HopkinsCitation -
P12-200-2711 - Klamath Project - TULE LAKE SUMP 2 - Specs. No. 200C-519 - Q-2 Lateral, Station 82. View looking east showing trimmed side slopes and bottom section; March 12, 1963; Photo by C. D. Lawr...
Citation -
KP-2574-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5307, R-Canal. Gasoline engine-driven pump supplies water for sprinkler system; September 30, 1960; Photo by John A. Renning
Citation -
KP-2624-R2-Klamath Project -- TULE LAKE SUMP 2, Specifications No. DC-5483, Q-3 Lateral. 1900-gallon water truck sprinkling the fill prior to placing next lift of lining material at Sta. 80+00. John Deere ...
Citation -
P-12-200-4196NA Klamath Project - Oregon-California. Ten cu. Yd. end dump truck dumping riprap downstream right side of Township Line Bridge. This is to be placed and shaped later with 3/4 yd. linkbelt ...
Citation -
7. [Image] KSD Enlargement, Lower Klamath Lake Division, Specs. 200C-922 - Patterson Constr. Co., Contractor
P-12-200-4222NA Klamath Project - Oregon-California. Borrow pit for sub-base material for road to be constructed on west bank of drain. Material was very tight and had to be ripped by a D-8 dozer. ...Citation -
8. [Image] KSD Enlargement, Lower Klamath Lake Division, Specs. 200C-922 - Patterson Constr. Co., Contractor
P-12-200-4223NA Klamath Project - Oregon-California. Borrow pit for finish grade material for road to be constricted on west bank of drain. D-8 dozer ripping material and 4 c.y. caterpillar loading 20 ...Citation -
P12-200-2817A Tule Lake Dike Repair - Klamath Project - Oregon-California. View of loading operation in borrow area "D" near Fish and Wildlife Service headquarters illustrating grading of material. ...
Citation -
10. [Image] Flood Damage Repair in Langell Valley
P12-200-2830NA Flood Damage Repair in Langell Valley - Klamath Project - Oregon - California. Specs. 200C-591, Contractor - Patterson Construction Co. Contractors riprap source is basalt talus, in Sec. ...Citation