Search

You searched for: Start Over Irrigation Remove constraint Irrigation Subject Klamath Project (U.S.) -- History Remove constraint Subject: Klamath Project (U.S.) -- History Subject Piling (Civil engineering) Remove constraint Subject: Piling (Civil engineering) Material Types Image Remove constraint Material Types: Image

Search Results

  • 2613
    KP-1976-R2 - Klamath Project. Lost River Channel Improvement, Langell Valley. Picture was taken from southeast side of piling looking north downstream showing old bridge after all the new piles are driven; ...
    Citation
  • 2614
    KP-1977-R2 - Klamath Project. Lost River Channel Improvement, Langell Valley. Sta.454-00. Picture taken from east side showing condition of piling before tops are cut off. Louis Petzoldt, inspecting; ...
    Citation
  • 2615
    KP-1978-R2 - Klamath Project. Telephoto. Lost River Channel Improvement, Langell Valley. Picture taken from east side of bridge showing alignment of piling and condition thereof. Mr. Louis Petzoldt inspecting; ...
    Citation
  • 2617
    KP-1980-R2 - Klamath Project. Telephoto. Lost River Channel Improvement, Langell Valley. Picture taken from southwest side showing top of pile and hammer after pile is driven; June 15, 1950; Photo by ...
    Citation
  • 2618
    KP-1981-R2 - Klamath Project. Lost River Channel Improvement, Langell Valley. Sta.454-00. Picture taken underneath bridge showing vertical cracks in piling. This pile will remain under bridge. Bob Caster, ...
    Citation
  • 2639
    KP-2070-R2 - Klamath Project. Klamath Straits Drain. Middle Canal Flume. Northeast side of flume showing newly driven piles. Piles are to support a concrete beam which will be poured after apron is ...
    Citation
  • 4644
    P12-201-4562NA Klamath Project, OR-CA. Center Canal Flume Bridge. The steel sleeve was placed on the pile and the holes in the sleeve were marked on the pile. The sleeve was then removed and a ship's ...
    Citation
  • 4645
    P12-201-4563NA Klamath Project, OR-CA. Center Canal Flume Bridge. Torquing the 14" x 3/4" steel bolts connecting the steel sleeve to bottom piling; April 4, 1978; USBR photo by D.J. Kline
    Citation
  • 4646
    P12-201-4564NA Klamath Project, OR-CA. Center Canal Flume Bridge. The top or splice piling is inserted into the sleeve and then the ship's auger was used to bore out the hole for the 3/4 " bolt; April ...
    Citation
  • 2464
    KP-1945 - Klamath Project. Lost River Channel Improvement, Langell Valley. Picture of bridge at Sta. 454-01 on Lost River just before replacement of piling. Picture taken from northwest side of Bridge. ...
    Citation