Search
You searched for:
Start Over
Irrigation
Remove constraint Irrigation
Subject
Klamath Project (U.S.) -- History
Remove constraint Subject: Klamath Project (U.S.) -- History
Subject
Piling (Civil engineering)
Remove constraint Subject: Piling (Civil engineering)
Material Types
Image
Remove constraint Material Types: Image
« Previous | 21 - 30 of 36 | Next »
Search Results
-
P12-201-4572NA Klamath Project, OR-CA. Plant E. Outlet east side bridge footing forms. Note back of footing was extended to allow for out of specifications piling. The extra concrete and steel was at ...
Citation -
P12-201-4316 NA Klamath Project, OR-CA. Completed bents No. 1 and 2 of construction bridge with P+H 670 in position to drive piling in Plant EE; January 18, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4318 NA Klamath Project, OR-CA. Vulcan No. 1 hammer to be used in Pumping Plant EE pile driving; January 18, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4319 NA Klamath Project, OR-CA. Shown is Row 12 vertical piling driven before cutoff at Pumping Plant EE site; January 20, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4320 NA Klamath Project, OR-CA. Row 12, Line 1, piling split at a depth of approximately 47 feet, Plant EE; January 20, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4321 NA Klamath Project, OR-CA. Pumping Plant EE - Setting batter piling butt into hammer lead; January 24, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4328 NA Klamath Project, OR-CA. View of pumping plant EE looking n. e. at piling with rows 6 thru 12 completed. Not shown are the 3 extra piling requred by the Regional office; February 17, ...
Citation -
P12-201-4330 NA Klamath Project, OR-CA. Shown is bent #4 of construction bridge. Notice: Extra piling on outside left as piling next to it did not meet specs. Also, with 14'x14' caps in place and 4x14" ...
Citation -
P12-201-4358 NA Klamath Project, OR-CA. Pumping Plant FF pile driving completed. Tension connector being put into place. View looking east toward inlet of plant; April 26, 1977; USBR photo by D. J. K...
Citation -
P12-201-4362 NA Klamath Project, OR-CA. Plant FF - Driving 1:2 batter piles at plant FF site. Manitowoc 2900 crane with 90 ft. leads using 50-C hammer, driven by Clayton Steam Generator. View looking ...
Citation